X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475152306000

Well Details

Well ID: 0475152306000
Loading map...
Location: 00/06-23-047-15W5/0
Location Alias: 00/06-23-47-15 W5M
Location Alias 2: 00/06-23-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 23
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 6-23-47-15
Operator Name: Cenovus Energy Inc.
License Number: 0067066
License Date: 1977-11-28
License Status: Issued
Spud Date: 1978-07-06
Final Drill Date: 1978-09-03
Well Total Depth: 3241.00 m
Surface Hole Latitude: 53.065843
Surface Hole Longitude: -116.090666

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-28 Obtained License
1978-08-01 Drill Stem Test Performed
1978-08-16 Drill Stem Test Performed
1978-09-03 Finished Drilling
1978-09-03 Well Log Performed
1978-09-03 Well Mode changed to Drilled and Cased
1978-09-06 Drill Stem Test Performed
1978-09-09 Production Casing Operation Performed
1978-12-20 Perforation Treatment Performed - Jet Perforation
1979-01-05 Perforation Treatment Performed - Acid Wash - No Pressure
1979-12-23 Perforation Treatment Performed - Jet Perforation
1980-01-30 Perforation Treatment Performed - Fractured
1980-06-02 Well Began Production
1980-06-02 Well Fluid changed to Crude Oil
1980-06-02 Well Mode changed to Flowing
1985-10-25 Well Fluid changed to Crude Oil
1985-10-25 Well Mode changed to Suspended
1985-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-10-30 Plug Back Performed
1985-10-30 Well Fluid changed to Crude Oil
1985-10-30 Well Log Performed
1985-10-30 Well Mode changed to Abandoned Zone
1985-11-05 Well Log Performed
1985-11-06 Perforation Treatment Performed - Jet Perforation
1985-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-07 Perforation Treatment Performed - Remedial Casing
1985-11-09 Well Log Performed
1985-11-10 Perforation Treatment Performed - Jet Perforation
1985-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-12 Perforation Treatment Performed - Remedial Casing
1985-11-13 Well Log Performed
1985-11-14 Perforation Treatment Performed - Jet Perforation
1986-01-10 Well Log Performed
1986-01-12 Well Log Performed
1986-01-13 Perforation Treatment Performed - Jet Perforation
1986-01-14 Perforation Treatment Performed - Cement Plug
1986-01-16 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-20 Perforation 3117.50 3120.50 3
1985-11-10 Perforation 2069.50 2070.00 13
1985-11-12 Acid Treatment 2024.50 2070.00 0
1985-11-12 Remedial Casing Cementing 2024.50 2070.00 0
1985-11-14 Perforation 2050.00 2054.00 13
1986-01-13 Perforation 2064.00 2064.50 13
1986-01-14 Cement Plug 2061.00 2062.50 0
1986-01-16 Fracture 2050.00 2054.00 0
1979-01-05 Acid Wash 3117.50 3120.50 0
1979-12-23 Perforation 3117.00 3122.00 6
1980-01-30 Fracture 3117.00 3122.00 0
1985-10-30 Packing Device Capped w/Cement 3045.50 3055.00 0
1985-11-06 Perforation 1760.00 1760.50 13
1985-11-07 Acid Treatment 1760.00 1760.50 0
1985-11-07 Remedial Casing Cementing 1760.00 1760.50 0
1985-11-10 Perforation 2024.50 2025.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 72 0.0 0.0 0.0
1980 3350 0.0 0.0 0.0
1981 4378 0.0 0.0 0.0
1982 8002 0.0 0.0 0.0
1983 8495 0.0 0.0 0.0
1984 8197 0.0 0.0 0.0
1985 6193 0.0 0.0 0.0

For data sources see[5]

References