X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475150107020

Well Details

Well ID: 0475150107020
Loading map...
Location: 02/07-01-047-15W5/0
Location Alias: 02/07-01-47-15 W5M
Location Alias 2: 02/07-01-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 01
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 7-1-47-15
Operator Name: Cenovus Energy Inc.
License Number: 0168178
License Date: 1994-06-27
License Status: RecCertified
Spud Date: 1994-07-13
Final Drill Date: 1994-08-22
Well Total Depth: 3169.00 m
Surface Hole Latitude: 53.023300
Surface Hole Longitude: -116.056019

For data sources see[1][2]

Well History

Date Event
1994-06-27 Obtained License
1994-07-15 Lost Circulation Occurred
1994-07-16 Surface Casing Operation Performed
1994-08-22 Finished Drilling
1994-08-22 Well Log Performed
1994-08-25 Production Casing Operation Performed
1994-08-26 Rig Released
1994-09-08 Well Log Performed
1994-09-10 Well Log Performed
1994-09-11 Perforation Treatment Performed - Jet Perforation
1994-09-12 Perforation Treatment Performed - Fractured
1994-09-23 Perforation Treatment Performed - Chemical Squeeze
1995-04-08 Perforation Treatment Performed - Jet Perforation
1995-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-10 Plug Back Performed
1995-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-14 Perforation Treatment Performed - Cement Squeeze
1995-04-14 Plug Back Performed
1995-04-16 Perforation Treatment Performed - Jet Perforation
1995-04-20 Perforation Treatment Performed - Fractured
1995-04-23 Well Log Performed
1995-05-14 Well Log Performed
1995-05-15 Perforation Treatment Performed - Jet Perforation
1995-05-16 Well Log Performed
1995-05-17 Perforation Treatment Performed - Fractured
1995-05-24 Well Log Performed
1995-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-05-25 Plug Back Performed
1997-10-23 Well Abandoned
1997-10-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-11 Perforation 2808.00 2812.00 20
1995-05-15 Perforation 3010.00 3018.00 14
1995-05-17 Fracture 3010.00 3018.00 0
1995-05-25 Packing Device Capped w/Cement 2947.00 2955.00 0
1994-09-12 Fracture 2808.00 2812.00 0
1994-09-23 Chemical Squeeze 2808.00 2812.00 0
1995-04-08 Perforation 3095.00 3096.00 14
1995-04-10 Packing Device Capped w/Cement 3067.00 3075.00 0
1995-04-14 Acid Treatment 2808.00 2812.00 0
1995-04-14 Cement Squeeze 2808.00 2812.00 0
1995-04-16 Perforation 3010.00 3015.00 14
1995-04-20 Fracture 3010.00 3015.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-07-15 Lost Circulation 364.00 375.00

For data sources see[5]

References