If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475130614003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.029201,"lon":-115.893242,"icon":""}]} |
Location: 00/14-06-047-13W5/3 | |
Location Alias: 00/14-06-47-13 W5M | |
Location Alias 2: 00/14-06-047-13 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 13 | |
Section: 06 | |
County/Municipality: Yellowhead County | |
Well Name: CVE BRAZR 14-6-47-13 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0198845 | |
License Date: 1997-03-03 | |
License Status: Issued | |
Spud Date: 1997-03-09 | |
Final Drill Date: 1997-04-13 | |
Well Total Depth: 3195.00 m | |
Surface Hole Latitude: 53.029201 | |
Surface Hole Longitude: -115.893242 |
Date | Event |
---|---|
1997-03-03 | Obtained License |
1997-03-10 | Lost Circulation Occurred |
1997-03-13 | Surface Casing Operation Performed |
1997-03-24 | Lost Circulation Occurred |
1997-03-26 | Well Log Performed |
1997-03-27 | Intermediate Casing Operation Performed |
1997-03-31 | Well Log Performed |
1997-04-13 | Finished Drilling |
1997-04-13 | Well Mode changed to Drilled and Cased |
1997-04-14 | Well Log Performed |
1997-04-15 | Liner Casing Operation Performed |
1997-04-17 | Rig Released |
1997-05-02 | Perforation Treatment Performed - Jet Perforation |
1997-05-02 | Well Log Performed |
1997-05-03 | Perforation Treatment Performed - Remedial Casing |
1997-05-08 | Perforation Treatment Performed - Jet Perforation |
1997-05-08 | Well Log Performed |
1997-05-10 | Perforation Treatment Performed - Fractured |
1998-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-03-07 | Plug Back Performed |
1998-03-07 | Well Log Performed |
1998-03-10 | Perforation Treatment Performed - Jet Perforation |
1998-03-10 | Well Log Performed |
1998-03-14 | Perforation Treatment Performed - Fractured |
1998-04-02 | Well Log Performed |
1998-04-06 | Perforation Treatment Performed - Fractured |
2000-12-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-12-19 | Plug Back Performed |
2000-12-19 | Well Log Performed |
2000-12-20 | Perforation Treatment Performed - Jet Perforation |
2000-12-20 | Well Log Performed |
2000-12-21 | Perforation Treatment Performed - Fractured |
2001-01-03 | Well Began Production |
2001-01-03 | Well Fluid changed to Gas |
2001-01-03 | Well Mode changed to Flowing |
2003-07-11 | Well Log Performed |
2003-07-12 | Perforation Treatment Performed - Jet Perforation |
2003-07-13 | Perforation Treatment Performed - Fractured |
2003-07-15 | Well Fluid changed to Gas |
2003-07-15 | Well Mode changed to Suspended |
2003-08-04 | Well Fluid changed to Gas |
2003-08-04 | Well Mode changed to Flowing |
2003-08-06 | Well Fluid changed to Gas |
2003-08-06 | Well Mode changed to Flowing |
2003-08-07 | Well Fluid changed to Gas |
2003-08-07 | Well Mode changed to Flowing |
2004-01-01 | Well Fluid changed to Gas |
2004-01-01 | Well Mode changed to Pumping |
2005-04-28 | Perforation Treatment Performed - Cement Plug |
2005-04-28 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-05-02 | Perforation | 1680.00 | 1681.00 | 13 |
1998-03-10 | Perforation | 3042.50 | 3051.50 | 13 |
1998-03-14 | Fracture | 3034.00 | 3051.50 | 0 |
1998-04-06 | Fracture | 3034.00 | 3051.50 | 0 |
2000-12-19 | Packing Device Capped w/Cement | 3017.00 | 3025.00 | 0 |
2000-12-20 | Perforation | 1696.00 | 1699.50 | 17 |
2000-12-21 | Fracture | 1696.00 | 1699.50 | 0 |
2003-07-12 | Perforation | 1735.00 | 1738.00 | 17 |
2003-07-13 | Fracture | 1735.00 | 1738.00 | 0 |
2005-04-28 | Cement Plug | 1727.00 | 1730.00 | 0 |
1997-05-03 | Remedial Casing Cementing | 1680.00 | 1681.00 | 0 |
1997-05-08 | Perforation | 3105.00 | 3107.00 | 20 |
1997-05-08 | Perforation | 3109.00 | 3110.00 | 20 |
1997-05-08 | Perforation | 3113.50 | 3114.50 | 20 |
1997-05-08 | Perforation | 3117.50 | 3120.00 | 20 |
1997-05-10 | Fracture | 3105.00 | 3120.00 | 0 |
1998-03-07 | Packing Device Capped w/Cement | 3092.00 | 3100.00 | 0 |
1998-03-10 | Perforation | 3034.00 | 3036.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 7908 | 0.0 | 0.0 | 0.0 |
2002 | 8190 | 0.0 | 0.0 | 0.0 |
2003 | 5889 | 0.0 | 0.0 | 0.0 |
2004 | 8443 | 0.0 | 0.0 | 0.0 |
2005 | 6408 | 0.0 | 0.0 | 0.0 |
2006 | 8161 | 0.0 | 0.0 | 0.0 |
2007 | 7727 | 0.0 | 0.0 | 0.0 |
2008 | 7295 | 0.0 | 0.0 | 0.0 |
2009 | 4200 | 0.0 | 0.0 | 0.0 |
2010 | 6152 | 0.0 | 0.0 | 0.0 |
2011 | 6898 | 0.0 | 0.0 | 0.0 |
2012 | 7378 | 0.0 | 0.0 | 0.0 |
2013 | 7158 | 0.0 | 0.0 | 0.0 |
2014 | 4852 | 0.0 | 0.0 | 0.0 |
2015 | 6182 | 0.0 | 0.0 | 0.0 |
2016 | 4164 | 0.0 | 0.0 | 0.0 |
2017 | 1592 | 0.0 | 0.0 | 0.0 |
2018 | 3745 | 0.0 | 0.0 | 0.0 |
2019 | 2490 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1997-03-10 | Lost Circulation | 20.00 | 69.00 |
1997-03-24 | Lost Circulation | 2430.00 | 2430.00 |
For data sources see[6]