If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475130211000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.027573,"lon":-115.796597,"icon":""}]} |
Location: 00/11-02-047-13W5/0 | |
Location Alias: 00/11-02-47-13 W5M | |
Location Alias 2: 00/11-02-047-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 13 | |
Section: 02 | |
County/Municipality: Yellowhead County | |
Well Name: CVE BRAZR 11-2-47-13 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0045023 | |
License Date: 1973-02-05 | |
License Status: Abandoned | |
Spud Date: 1973-02-15 | |
Final Drill Date: 1973-03-18 | |
Well Total Depth: 2923.00 m | |
Surface Hole Latitude: 53.027573 | |
Surface Hole Longitude: -115.796597 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1973-02-05 | Obtained License |
1973-03-18 | Finished Drilling |
1973-03-21 | Production Casing Operation Performed |
1973-03-31 | Well Mode changed to Drilled and Cased |
1973-07-27 | Perforation Treatment Performed - Jet Perforation |
1973-07-29 | Perforation Treatment Performed - Jet Perforation |
1973-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-10-29 | Well Began Production |
1974-10-29 | Well Fluid changed to Gas |
1974-10-29 | Well Mode changed to Flowing |
1994-09-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-01-17 | Well Log Performed |
1999-01-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-01-18 | Well Fluid changed to Gas |
1999-01-18 | Well Mode changed to Abandoned Zone |
1999-01-19 | Well Log Performed |
1999-01-20 | Perforation Treatment Performed - Jet Perforation |
1999-01-24 | Perforation Treatment Performed - Fractured |
2002-07-11 | Well Log Performed |
2002-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-07-12 | Plug Back Performed |
2002-07-12 | Well Log Performed |
2002-07-13 | Perforation Treatment Performed - Jet Perforation |
2002-07-13 | Well Log Performed |
2002-07-16 | Perforation Treatment Performed - Fractured |
2014-08-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-08-13 | Plug Back Performed |
2014-08-18 | Perforation Treatment Performed - Jet Perforation |
2014-08-19 | Perforation Treatment Performed - Remedial Casing |
2014-08-20 | Perforation Treatment Performed - Jet Perforation |
2014-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-08-21 | Perforation Treatment Performed - Remedial Casing |
2014-08-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-08-22 | Perforation Treatment Performed - Jet Perforation |
2014-08-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-08-23 | Perforation Treatment Performed - Jet Perforation |
2014-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-08-24 | Perforation Treatment Performed - Remedial Casing |
2014-09-16 | Well Abandoned |
2015-10-27 | Perforation Treatment Performed - Jet Perforation |
2015-10-27 | Well Log Performed |
2015-10-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-10-30 | Perforation Treatment Performed - Jet Perforation |
2015-10-30 | Perforation Treatment Performed - Remedial Casing |
2015-10-30 | Well Log Performed |
2015-10-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-07-27 | Perforation | 2880.70 | 2881.00 | 13 |
1999-01-24 | Fracture | 2773.70 | 2776.10 | 0 |
2002-07-12 | Packing Device Capped w/Cement | 2759.00 | 2767.00 | 0 |
2002-07-13 | Perforation | 2559.50 | 2560.50 | 20 |
2002-07-16 | Fracture | 2559.50 | 2560.50 | 0 |
2014-08-13 | Packing Device Capped w/Cement | 2542.00 | 2550.00 | 0 |
2014-08-18 | Perforation | 1476.00 | 1477.00 | 13 |
2014-08-19 | Remedial Casing Cementing | 1476.00 | 1477.00 | 0 |
2014-08-20 | Perforation | 879.00 | 880.00 | 13 |
2014-08-21 | Remedial Casing Cementing | 879.00 | 880.00 | 0 |
2014-08-21 | Packing Device Capped w/Cement | 835.00 | 874.00 | 0 |
1973-07-27 | Perforation | 2891.30 | 2891.60 | 13 |
2014-08-22 | Perforation | 602.00 | 603.00 | 13 |
2014-08-22 | Packing Device Capped w/Cement | 584.00 | 592.00 | 0 |
2014-08-22 | Perforation | 565.00 | 566.00 | 13 |
2014-08-22 | Packing Device Capped w/Cement | 549.00 | 559.00 | 0 |
2014-08-22 | Perforation | 539.00 | 540.00 | 13 |
2014-08-23 | Packing Device Capped w/Cement | 518.00 | 526.00 | 0 |
2014-08-23 | Perforation | 457.00 | 458.00 | 13 |
2014-08-23 | Packing Device Capped w/Cement | 436.00 | 449.00 | 0 |
2014-08-23 | Perforation | 426.00 | 427.00 | 13 |
2014-08-23 | Packing Device Capped w/Cement | 409.00 | 417.00 | 0 |
1973-07-29 | Perforation | 2879.10 | 2881.30 | 3 |
2014-08-23 | Perforation | 343.00 | 344.00 | 13 |
2014-08-24 | Remedial Casing Cementing | 343.00 | 344.00 | 0 |
2014-08-24 | Packing Device Capped w/Cement | 321.00 | 366.00 | 0 |
2015-10-27 | Perforation | 218.00 | 224.00 | 18 |
2015-10-28 | Acid Treatment | 218.00 | 224.00 | 0 |
2015-10-30 | Perforation | 218.00 | 219.30 | 13 |
2015-10-30 | Perforation | 221.10 | 222.40 | 13 |
2015-10-30 | Remedial Casing Cementing | 218.00 | 224.00 | 0 |
2015-10-31 | Packing Device Capped w/Cement | 155.80 | 332.80 | 0 |
1973-07-29 | Perforation | 2887.70 | 2889.20 | 3 |
1973-07-29 | Perforation | 2891.60 | 2895.60 | 3 |
1973-07-30 | Acid Treatment | 2880.70 | 2895.60 | 0 |
1994-09-03 | Acid Treatment | 2879.10 | 2895.60 | 0 |
1999-01-18 | Packing Device Capped w/Cement | 2839.00 | 2847.00 | 0 |
1999-01-20 | Perforation | 2773.70 | 2776.10 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1973 | 82 | 0.0 | 0.0 | 0.0 |
1974 | 1517 | 0.0 | 0.0 | 0.0 |
1975 | 8426 | 0.0 | 0.0 | 0.0 |
1976 | 8501 | 0.0 | 0.0 | 0.0 |
1977 | 8152 | 0.0 | 0.0 | 0.0 |
1978 | 7891 | 0.0 | 0.0 | 0.0 |
1979 | 8023 | 0.0 | 0.0 | 0.0 |
1980 | 7439 | 0.0 | 0.0 | 0.0 |
1981 | 4773 | 0.0 | 0.0 | 0.0 |
1982 | 1598 | 0.0 | 0.0 | 0.0 |
1983 | 4378 | 0.0 | 0.0 | 0.0 |
1984 | 5744 | 0.0 | 0.0 | 0.0 |
1985 | 7806 | 0.0 | 0.0 | 0.0 |
1986 | 6790 | 0.0 | 0.0 | 0.0 |
1987 | 5313 | 0.0 | 0.0 | 0.0 |
1988 | 6667 | 0.0 | 0.0 | 0.0 |
1989 | 8221 | 0.0 | 0.0 | 0.0 |
1990 | 5115 | 0.0 | 0.0 | 0.0 |
1991 | 4462 | 0.0 | 0.0 | 0.0 |
1992 | 8006 | 0.0 | 0.0 | 0.0 |
1993 | 8307 | 0.0 | 0.0 | 0.0 |
1994 | 6540 | 0.0 | 0.0 | 0.0 |
1995 | 7272 | 0.0 | 0.0 | 0.0 |
1996 | 5847 | 0.0 | 0.0 | 0.0 |
1997 | 7662 | 0.0 | 0.0 | 0.0 |
1998 | 8575 | 0.0 | 0.0 | 0.0 |
1999 | 337 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-09-16 | No Incident Encountered | 0.00 | 0.00 |
2015-11-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]