If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475123407000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.095264,"lon":-115.666669,"icon":""}]} |
Location: 00/07-34-047-12W5/0 | |
Location Alias: 00/07-34-47-12 W5M | |
Location Alias 2: 00/07-34-047-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 12 | |
Section: 34 | |
County/Municipality: Yellowhead County | |
Well Name: TIDEWATER BRAZR 7-34-47-12 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0064655 | |
License Date: 1977-07-07 | |
License Status: Abandoned | |
Spud Date: 1977-07-25 | |
Final Drill Date: 1977-10-19 | |
Well Total Depth: 3185.20 m | |
Surface Hole Latitude: 53.095264 | |
Surface Hole Longitude: -115.666669 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-07-07 | Obtained License |
1977-09-09 | Drill Stem Test Performed |
1977-10-19 | Finished Drilling |
1977-10-25 | Production Casing Operation Performed |
1977-11-07 | Perforation Treatment Performed - Jet Perforation |
1978-03-14 | Perforation Treatment Performed - Acid Wash - No Pressure |
1978-03-26 | Well Mode changed to Drilled and Cased |
1984-06-07 | Well Began Production |
1984-06-07 | Well Fluid changed to Gas |
1984-06-07 | Well Mode changed to Flowing |
1990-04-01 | Well Began Injection |
1990-04-01 | Well Fluid changed to Gas |
1990-04-01 | Well Type changed to Injection |
1996-12-15 | Well Log Performed |
1996-12-17 | Well Log Performed |
1996-12-18 | Well Log Performed |
1997-01-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-01-09 | Plug Back Performed |
1997-01-09 | Well Fluid changed to Gas |
1997-01-09 | Well Mode changed to Abandoned Zone |
1997-01-09 | Well Type changed to Injection |
1997-01-14 | Well Log Performed |
1997-01-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-01-15 | Well Log Performed |
1997-01-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-01-16 | Perforation Treatment Performed - Jet Perforation |
1997-01-16 | Well Log Performed |
1997-01-17 | Perforation Treatment Performed - Cement Plug |
1997-01-17 | Perforation Treatment Performed - Remedial Casing |
1997-01-19 | Perforation Treatment Performed - Jet Perforation |
1997-01-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-01-21 | Perforation Treatment Performed - Jet Perforation |
1997-01-21 | Well Log Performed |
1997-01-22 | Perforation Treatment Performed - Cement Plug |
1997-01-22 | Perforation Treatment Performed - Remedial Casing |
1997-01-23 | Well Abandoned |
1997-01-23 | Well Fluid changed to Gas |
1997-01-23 | Well Mode changed to Abandoned |
1997-01-23 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-11-07 | Perforation | 3113.80 | 3126.00 | 7 |
1997-01-21 | Packing Device Capped w/Cement | 652.00 | 660.00 | 0 |
1997-01-21 | Perforation | 500.00 | 501.00 | 13 |
1997-01-22 | Remedial Casing Cementing | 500.00 | 501.00 | 0 |
1997-01-22 | Cement Plug | 3.50 | 501.00 | 0 |
1978-03-14 | Acid Wash | 3113.80 | 3126.00 | 0 |
1997-01-09 | Packing Device Capped w/Cement | 2860.00 | 2994.00 | 0 |
1997-01-15 | Packing Device Capped w/Cement | 2839.00 | 2847.00 | 14 |
1997-01-16 | Packing Device Capped w/Cement | 1697.00 | 1705.00 | 0 |
1997-01-16 | Perforation | 1495.00 | 1496.00 | 14 |
1997-01-17 | Remedial Casing Cementing | 1495.00 | 1496.00 | 13 |
1997-01-17 | Cement Plug | 716.00 | 1496.00 | 0 |
1997-01-19 | Perforation | 670.00 | 671.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 126 | 0.0 | 0.0 | 0.0 |
1984 | 1631 | 0.0 | 0.0 | 0.0 |
1985 | 5826 | 0.0 | 0.0 | 0.0 |
1986 | 4204 | 0.0 | 0.0 | 0.0 |
1987 | 5942 | 0.0 | 0.0 | 0.0 |
1988 | 7890 | 0.0 | 0.0 | 0.0 |
1989 | 7879 | 0.0 | 0.0 | 0.0 |
1990 | 1655 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]