X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475120610002

Well Details

Well ID: 0475120610002
Loading map...
Location: 00/10-06-047-12W5/2
Location Alias: 00/10-06-47-12 W5M
Location Alias 2: 00/10-06-047-12 W5/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 12
Section: 06
County/Municipality: Yellowhead County
Well Name: AMOCO BRAZR 10-6-47-12
Operator Name: BP Canada Energy Group ULC
License Number: 0055121
License Date: 1975-09-26
License Status: RecCertified
Spud Date: 1975-09-26
Final Drill Date: 1975-10-26
Well Total Depth: 2903.20 m
Surface Hole Latitude: 53.025469
Surface Hole Longitude: -115.742295

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-26 Obtained License
1975-10-24 Drill Stem Test Performed
1975-10-26 Finished Drilling
1975-10-26 Well Mode changed to Drilled and Cased
1975-10-29 Drill Stem Test Performed
1975-10-30 Drill Stem Test Performed
1975-11-01 Production Casing Operation Performed
1976-10-06 Perforation Treatment Performed - Jet Perforation
1976-10-07 Perforation Treatment Performed - Acid Wash - No Pressure
1976-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-07-15 Perforation Treatment Performed - Jet Perforation
1977-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-18 Perforation Treatment Performed - Fractured
1977-08-11 Well Began Production
1977-08-11 Well Fluid changed to Crude Oil
1977-08-11 Well Mode changed to Flowing
1984-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-29 Plug Back Performed
1984-06-29 Well Log Performed
1984-06-30 Perforation Treatment Performed - Jet Perforation
1984-07-05 Perforation Treatment Performed - Fractured
1984-07-07 Well Log Performed
1984-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-07-10 Plug Back Performed
1984-07-10 Well Abandoned
1984-07-10 Well Fluid changed to Crude Oil
1984-07-10 Well Log Performed
1984-07-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-10-06 Perforation 2824.90 2826.10 7
1984-06-29 Packing Device Capped w/Cement 2707.00 2715.00 0
1984-06-30 Perforation 2498.10 2500.00 13
1984-07-05 Fracture 2498.10 2500.00 0
1984-07-10 Packing Device Capped w/Cement 2480.00 2488.00 0
1976-10-06 Perforation 2827.90 2829.50 7
1976-10-06 Perforation 2831.00 2833.40 7
1976-10-07 Acid Wash 2824.90 2833.40 0
1976-10-08 Acid Treatment 2824.90 2833.40 0
1977-07-15 Packing Device Capped w/Cement 2795.00 2795.00 0
1977-07-15 Perforation 2737.10 2738.60 10
1977-07-17 Acid Treatment 2737.10 2738.60 0
1977-07-18 Fracture 2737.10 2738.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 302 0.0 0.0 0.0
1978 5260 0.0 0.0 0.0
1979 5734 0.0 0.0 0.0
1980 7200 0.0 0.0 0.0
1981 7302 0.0 0.0 0.0
1982 7178 0.0 0.0 0.0
1983 3118 0.0 0.0 0.0
1984 4210 0.0 0.0 0.0

For data sources see[5]

References