X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475120109000

Well Details

Well ID: 0475120109000
Loading map...
Location: 00/09-01-047-12W5/0
Location Alias: 00/09-01-47-12 W5M
Location Alias 2: 00/09-01-047-12 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 12
Section: 01
County/Municipality: Yellowhead County
Well Name: SDEL HZ BRAZR 9-1-47-12
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0445433
License Date: 2012-04-19
License Status: Issued
Spud Date: 2012-05-02
Final Drill Date: 2012-05-14
Well Total Depth: 3604.00 m
Surface Hole Latitude: 53.020364
Surface Hole Longitude: -115.634817

For data sources see[1][2]

Well History

Date Event
2012-04-19 Obtained License
2012-05-02 Well Log Performed
2012-05-03 Surface Casing Operation Performed
2012-05-05 Direction Drilling Operation Performed - Deviate
2012-05-06 Direction Drilling Operation Performed - Horizontal
2012-05-11 Well Log Performed
2012-05-14 Finished Drilling
2012-05-14 Well Log Performed
2012-05-14 Well Mode changed to Drilled and Cased
2012-05-17 Production Casing Operation Performed
2012-05-17 Rig Released
2012-05-26 Well Log Performed
2012-06-05 Well Began Production
2012-06-05 Well Fluid changed to Crude Oil
2012-06-05 Well Mode changed to Pumping
2012-06-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-06 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-02 Nabors Drilling Limited 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-05 1492.60 Deviate (5 - 79 degrees)
2012-05-06 2349.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-06 Open Hole/Barefoot Completion 3603.00 3604.00 0
2012-06-06 Multi-Stage Fracture 3073.90 3074.00 0
2012-06-06 Multi-Stage Fracture 3011.30 3011.40 0
2012-06-06 Multi-Stage Fracture 2949.10 2949.20 0
2012-06-06 Multi-Stage Fracture 2886.90 2887.00 0
2012-06-06 Multi-Stage Fracture 2824.60 2824.70 0
2012-06-06 Multi-Stage Fracture 2762.20 2762.30 0
2012-06-06 Multi-Stage Fracture 2704.00 2704.10 0
2012-06-06 Multi-Stage Fracture 2645.90 2646.00 0
2012-06-06 Multi-Stage Fracture 2581.60 2581.70 0
2012-06-06 Multi-Stage Fracture 2519.60 2519.70 0
2012-06-06 Multi-Stage Fracture 3581.50 3581.60 0
2012-06-06 Multi-Stage Fracture 2468.80 2648.90 0
2012-06-06 Multi-Stage Fracture 3513.90 3514.00 0
2012-06-06 Multi-Stage Fracture 3451.60 3451.70 0
2012-06-06 Multi-Stage Fracture 3389.50 3389.60 0
2012-06-06 Multi-Stage Fracture 3330.90 3331.00 0
2012-06-06 Multi-Stage Fracture 3265.70 3265.80 0
2012-06-06 Multi-Stage Fracture 3200.20 3200.30 0
2012-06-06 Multi-Stage Fracture 3136.30 3136.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4735 0.0 0.0 0.0
2013 8518 0.0 0.0 0.0
2014 7862 0.0 0.0 0.0
2015 6340 0.0 0.0 0.0
2016 5400 0.0 0.0 0.0
2017 8627 0.0 0.0 0.0
2018 8361 0.0 0.0 0.0
2019 8613 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-17 No Incident Encountered 0.00 0.00
2012-06-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References