X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475113210000

Well Details

Well ID: 0475113210000
Loading map...
Location: 00/10-32-047-11W5/0
Location Alias: 00/10-32-47-11 W5M
Location Alias 2: 00/10-32-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 32
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 10-32-47-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0382157
License Date: 2007-09-24
License Status: Issued
Spud Date: 2007-10-22
Final Drill Date: 2007-11-24
Well Total Depth: 3521.00 m
Surface Hole Latitude: 53.084304
Surface Hole Longitude: -115.566031

For data sources see[1][2]

Well History

Date Event
2007-09-24 Obtained License
2007-10-25 Surface Casing Operation Performed
2007-10-27 Direction Drilling Operation Performed - Deviate
2007-11-18 Well Log Performed
2007-11-21 Intermediate Casing Operation Performed
2007-11-22 Well Log Performed
2007-11-24 Finished Drilling
2007-11-24 Well Mode changed to Drilled and Cased
2007-11-25 Well Log Performed
2007-11-28 Liner Casing Operation Performed
2007-11-29 Rig Released
2008-03-15 Perforation Treatment Performed - Jet Perforation
2008-03-15 Perforation Treatment Performed - Remedial Casing
2008-03-15 Well Log Performed
2008-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-20 Well Log Performed
2008-06-20 Well Log Performed
2008-07-09 Perforation Treatment Performed - Cement Plug
2008-07-10 Perforation Treatment Performed - Jet Perforation
2008-07-10 Perforation Treatment Performed - Remedial Casing
2008-07-10 Well Log Performed
2008-07-13 Well Log Performed
2008-07-16 Production Casing Operation Performed
2008-07-22 Perforation Treatment Performed - Jet Perforation
2008-07-22 Well Log Performed
2008-07-24 Perforation Treatment Performed - Fractured
2008-07-27 Perforation Treatment Performed - Jet Perforation
2008-07-27 Well Log Performed
2008-07-28 Perforation Treatment Performed - Fractured
2008-09-19 Well Began Production
2008-09-19 Well Fluid changed to Crude Oil
2008-09-19 Well Mode changed to Flowing
2008-09-20 Well Fluid changed to Crude Oil
2008-09-20 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-10-27 520.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-03-15 Perforation 1690.00 1691.00 4
2008-07-24 Fracture 2819.50 2821.50 0
2008-07-27 Perforation 2786.00 2788.00 17
2008-07-28 Fracture 2786.00 2788.00 0
2008-03-15 Remedial Casing Cementing 1690.00 1691.00 0
2008-03-20 Packing Device Capped w/Cement 1677.00 1685.00 0
2008-07-09 Cement Plug 3329.00 3359.00 0
2008-07-10 Perforation 600.00 600.10 17
2008-07-10 Perforation 560.00 560.10 17
2008-07-10 Remedial Casing Cementing 600.00 600.10 0
2008-07-10 Remedial Casing Cementing 560.00 560.10 0
2008-07-22 Perforation 2819.50 2821.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 1219 0.0 0.0 0.0
2009 7147 0.0 0.0 0.0
2010 7778 0.0 0.0 0.0
2011 8292 0.0 0.0 0.0
2012 8056 0.0 0.0 0.0
2013 8084 0.0 0.0 0.0
2014 8270 0.0 0.0 0.0
2015 7495 0.0 0.0 0.0
2016 8665 0.0 0.0 0.0
2017 8445 0.0 0.0 0.0
2018 5554 0.0 0.0 0.0
2019 2592 0.0 0.0 0.0
2020 936 0.0 0.0 0.0

For data sources see[6]

References