X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475113004000

Well Details

Well ID: 0475113004000
Loading map...
Location: 00/04-30-047-11W5/0
Location Alias: 00/04-30-47-11 W5M
Location Alias 2: 00/04-30-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 30
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ BRAZR 4-30-47-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0441964
License Date: 2011-12-22
License Status: Issued
Spud Date: 2012-01-16
Final Drill Date: 2012-02-07
Well Total Depth: 3675.00 m
Surface Hole Latitude: 53.077282
Surface Hole Longitude: -115.587550

For data sources see[1][2]

Well History

Date Event
2011-12-08 Well Log Performed
2011-12-22 Obtained License
2012-01-16 Well Log Performed
2012-01-19 Surface Casing Operation Performed
2012-01-23 Direction Drilling Operation Performed - Horizontal
2012-01-30 Well Log Performed
2012-02-07 Finished Drilling
2012-02-07 Well Mode changed to Drilled and Cased
2012-02-10 Intermediate Casing Operation Performed
2012-02-10 Liner Casing Operation Performed
2012-02-10 Rig Released
2012-02-13 Well Log Performed
2012-02-15 Well Log Performed
2012-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-23 Perforation Treatment Performed - Open-Hole Completion
2012-02-24 Well Fluid changed to Gas
2012-02-24 Well Mode changed to Testing
2012-08-02 Well Began Production
2012-08-02 Well Fluid changed to Gas
2012-08-02 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-16 Precision Drilling Corporation 414 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-23 2197.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-23 Open Hole/Barefoot Completion 3620.00 3675.00 0
2012-02-23 Multi-Stage Fracture 2895.10 2895.20 0
2012-02-23 Multi-Stage Fracture 2819.40 2819.50 0
2012-02-23 Multi-Stage Fracture 3547.90 3548.00 0
2012-02-23 Multi-Stage Fracture 3472.20 3472.30 0
2012-02-23 Multi-Stage Fracture 3396.40 3396.50 0
2012-02-23 Multi-Stage Fracture 3308.80 3308.90 0
2012-02-23 Multi-Stage Fracture 3223.00 3223.10 0
2012-02-23 Multi-Stage Fracture 3147.90 3148.00 0
2012-02-23 Multi-Stage Fracture 3057.70 3057.80 0
2012-02-23 Multi-Stage Fracture 2982.00 2982.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3721 0.0 0.0 0.0
2013 7808 0.0 0.0 0.0
2014 8223 0.0 0.0 0.0
2015 5085 0.0 0.0 0.0
2016 8495 0.0 0.0 0.0
2017 8460 0.0 0.0 0.0
2018 8705 0.0 0.0 0.0
2019 8643 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

References