If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475112914020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.077296,"lon":-115.581617,"icon":""}]} |
Location: 02/14-29-047-11W5/0 | |
Location Alias: 02/14-29-47-11 W5M | |
Location Alias 2: 02/14-29-047-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 11 | |
Section: 29 | |
County/Municipality: Brazeau County | |
Well Name: SDEL 102 PEMBINA 14-29-47-11 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0449748 | |
License Date: 2012-11-02 | |
License Status: Amended | |
Spud Date: 2012-12-08 | |
Final Drill Date: 2012-12-19 | |
Well Total Depth: 3170.00 m | |
Surface Hole Latitude: 53.077296 | |
Surface Hole Longitude: -115.581617 |
Date | Event |
---|---|
2012-11-02 | Obtained License |
2012-12-07 | Well Log Performed |
2012-12-09 | Surface Casing Operation Performed |
2012-12-11 | Direction Drilling Operation Performed - Deviate |
2012-12-14 | Direction Drilling Operation Performed - Horizontal |
2012-12-19 | Finished Drilling |
2012-12-19 | Well Log Performed |
2012-12-19 | Well Mode changed to Drilled and Cased |
2012-12-21 | Production Casing Operation Performed |
2012-12-21 | Rig Released |
2013-03-15 | Well Log Performed |
2013-03-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-25 | Perforation Treatment Performed - Open-Hole Completion |
2013-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-27 | Well Began Production |
2013-03-27 | Well Fluid changed to Crude Oil |
2013-03-27 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-12-08 | Savanna Drilling Corp. | 604 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-12-11 | 1422.00 | Deviate (5 - 79 degrees) |
2012-12-14 | 2116.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-03-25 | Open Hole/Barefoot Completion | 3165.00 | 3170.00 | 0 |
2013-03-25 | Multi-Stage Fracture | 2822.10 | 2822.20 | 0 |
2013-03-25 | Multi-Stage Fracture | 2771.50 | 2771.60 | 0 |
2013-03-25 | Multi-Stage Fracture | 2732.40 | 2732.50 | 0 |
2013-03-25 | Multi-Stage Fracture | 2693.50 | 2693.60 | 0 |
2013-03-25 | Multi-Stage Fracture | 2654.90 | 2655.00 | 0 |
2013-03-25 | Multi-Stage Fracture | 2615.60 | 2615.70 | 0 |
2013-03-26 | Multi-Stage Fracture | 2564.70 | 2564.80 | 0 |
2013-03-26 | Multi-Stage Fracture | 2525.30 | 2525.40 | 0 |
2013-03-26 | Multi-Stage Fracture | 2486.60 | 2486.70 | 0 |
2013-03-26 | Multi-Stage Fracture | 2447.30 | 2447.40 | 0 |
2013-03-25 | Multi-Stage Fracture | 3153.50 | 3153.60 | 0 |
2013-03-26 | Multi-Stage Fracture | 2408.60 | 2480.70 | 0 |
2013-03-26 | Multi-Stage Fracture | 2358.30 | 2358.40 | 0 |
2013-03-26 | Multi-Stage Fracture | 2319.40 | 2319.50 | 0 |
2013-03-26 | Multi-Stage Fracture | 2279.90 | 2280.00 | 0 |
2013-03-26 | Multi-Stage Fracture | 2241.20 | 2241.30 | 0 |
2013-03-26 | Multi-Stage Fracture | 2202.40 | 2202.50 | 0 |
2013-03-26 | Multi-Stage Fracture | 2151.80 | 2151.90 | 0 |
2013-03-25 | Multi-Stage Fracture | 3108.20 | 3108.30 | 0 |
2013-03-25 | Multi-Stage Fracture | 3068.80 | 3068.90 | 0 |
2013-03-25 | Multi-Stage Fracture | 3029.80 | 3029.90 | 0 |
2013-03-25 | Multi-Stage Fracture | 2978.70 | 2978.80 | 0 |
2013-03-25 | Multi-Stage Fracture | 2939.50 | 2939.60 | 0 |
2013-03-25 | Multi-Stage Fracture | 2900.70 | 2900.80 | 0 |
2013-03-25 | Multi-Stage Fracture | 2861.00 | 2861.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-25 | 2013-03-26 | 1,908 | 3,875 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 85.0061 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.2888 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.1118 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0121 | N/A | |
Water | 7732-18-5 | 100 | 0.0128 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.077 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0886 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0908 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0887 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1081 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0886 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0898 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0908 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 3.7359 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0926 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-03-14 | 2013-04-01 | Surface Water - River | 1659 |
2013-03-14 | 2013-04-01 | Recycled Fracturing Water (treated at well site) | 1342 |
2013-03-14 | 2013-04-01 | Recycled Fracturing Water (treated at well site) | 1495 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 5732 | 0.0 | 0.0 | 0.0 |
2014 | 8643 | 0.0 | 0.0 | 0.0 |
2015 | 8690 | 0.0 | 0.0 | 0.0 |
2016 | 6365 | 0.0 | 0.0 | 0.0 |
2017 | 5366 | 0.0 | 0.0 | 0.0 |
2019 | 2088 | 0.0 | 0.0 | 0.0 |
2020 | 2102 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-12-21 | No Incident Encountered | 0.00 | 0.00 |
2013-04-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]