X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475112705030

Well Details

Well ID: 0475112705030
Loading map...
Location: 03/05-27-047-11W5/0
Location Alias: 03/05-27-47-11 W5M
Location Alias 2: 03/05-27-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 27
County/Municipality: Brazeau County
Well Name: DAYLIGHT 103 HZ PEMBINA 5-27-47-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0419324
License Date: 2010-03-18
License Status: Amended
Spud Date: 2010-07-18
Final Drill Date: 2010-08-04
Well Total Depth: 3409.00 m
Surface Hole Latitude: 53.082879
Surface Hole Longitude: -115.511983

For data sources see[1][2]

Well History

Date Event
2010-03-18 Obtained License
2010-07-18 Well Log Performed
2010-07-21 Surface Casing Operation Performed
2010-07-22 Well Log Performed
2010-07-24 Direction Drilling Operation Performed - Horizontal
2010-07-28 Intermediate Casing Operation Performed
2010-08-04 Finished Drilling
2010-08-04 Well Log Performed
2010-08-04 Well Mode changed to Drilled and Cased
2010-08-08 Liner Casing Operation Performed
2010-08-09 Rig Released
2010-08-19 Well Log Performed
2010-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-26 Perforation Treatment Performed - Open-Hole Completion
2010-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-08 Well Began Production
2010-09-08 Well Fluid changed to Crude Oil
2010-09-08 Well Mode changed to Pumping
2014-08-01 Well Fluid changed to Crude Oil
2014-08-01 Well Mode changed to Suspended
2017-06-05 Well Fluid changed to Crude Oil
2017-06-05 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-24 1578.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-26 Open Hole/Barefoot Completion 3404.00 3408.00 0
2010-08-26 Multi-Stage Fracture 2760.70 2760.80 0
2010-08-27 Multi-Stage Fracture 2672.70 2672.80 0
2010-08-27 Multi-Stage Fracture 2598.40 2598.50 0
2010-08-27 Multi-Stage Fracture 2526.10 2526.20 0
2010-08-27 Multi-Stage Fracture 2451.90 2452.00 0
2010-08-27 Multi-Stage Fracture 2363.80 2363.90 0
2010-08-27 Multi-Stage Fracture 2289.50 2289.60 0
2010-08-27 Multi-Stage Fracture 2215.20 2215.30 0
2010-08-27 Multi-Stage Fracture 2127.10 2127.20 0
2010-08-27 Multi-Stage Fracture 2052.80 2052.90 0
2010-08-26 Multi-Stage Fracture 3383.10 3383.20 0
2010-08-26 Multi-Stage Fracture 3289.30 3289.40 0
2010-08-26 Multi-Stage Fracture 3214.00 3214.10 0
2010-08-26 Multi-Stage Fracture 3138.80 3138.90 0
2010-08-26 Multi-Stage Fracture 3063.50 3063.60 0
2010-08-26 Multi-Stage Fracture 2988.20 2988.30 0
2010-08-26 Multi-Stage Fracture 2909.20 2909.30 0
2010-08-26 Multi-Stage Fracture 2834.90 2835.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2705 0.0 0.0 0.0
2011 8174 0.0 0.0 0.0
2012 7465 0.0 0.0 0.0
2013 148 0.0 0.0 0.0
2017 2286 0.0 0.0 0.0
2018 7014 0.0 0.0 0.0
2019 6264 0.0 0.0 0.0
2020 728 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References