X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475110801020

Well Details

Well ID: 0475110801020
Loading map...
Location: 02/01-08-047-11W5/0
Location Alias: 02/01-08-47-11 W5M
Location Alias 2: 02/01-08-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 08
County/Municipality: Brazeau County
Well Name: BACCALIEU 102 HZ BRAZR 1-8-47-11
Operator Name: Baccalieu Energy Inc.
License Number: 0455728
License Date: 2013-03-05
License Status: Issued
Spud Date: 2013-03-28
Final Drill Date: 2013-04-14
Well Total Depth: 3624.00 m
Surface Hole Latitude: 53.047887
Surface Hole Longitude: -115.571241

For data sources see[1][2]

Well History

Date Event
2013-03-05 Obtained License
2013-03-29 Surface Casing Operation Performed
2013-03-31 Direction Drilling Operation Performed - Deviate
2013-04-02 Direction Drilling Operation Performed - Horizontal
2013-04-05 Intermediate Casing Operation Performed
2013-04-06 Well Log Performed
2013-04-14 Finished Drilling
2013-04-14 Well Log Performed
2013-04-14 Well Mode changed to Drilled and Cased
2013-04-17 Perforation Treatment Performed - Open-Hole Completion
2013-04-18 Liner Casing Operation Performed
2013-04-18 Rig Released
2013-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2013-05-10 Well Began Production
2013-05-10 Well Fluid changed to Crude Oil
2013-05-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-03-28 Ensign Drilling Inc. 544 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-03-31 1515.30 Deviate (5 - 79 degrees)
2013-04-02 2173.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-04-17 Open Hole/Barefoot Completion 3605.00 3624.00 0
2013-05-09 Multi-Stage Fracture 3037.50 3037.60 0
2013-05-09 Multi-Stage Fracture 2963.30 2963.40 0
2013-05-09 Multi-Stage Fracture 2889.10 2889.20 0
2013-05-09 Multi-Stage Fracture 2828.80 2828.90 0
2013-05-09 Multi-Stage Fracture 2754.60 2754.70 0
2013-05-09 Multi-Stage Fracture 2680.60 2680.70 0
2013-05-09 Multi-Stage Fracture 2620.20 2620.30 0
2013-05-09 Multi-Stage Fracture 2546.00 2546.10 0
2013-05-09 Multi-Stage Fracture 2471.80 2471.90 0
2013-05-09 Multi-Stage Fracture 2411.60 2411.70 0
2013-05-09 Multi-Stage Fracture 3577.70 3577.80 0
2013-05-09 Multi-Stage Fracture 2337.40 2337.50 0
2013-05-09 Multi-Stage Fracture 2277.10 2277.20 0
2013-05-09 Multi-Stage Fracture 3529.30 3529.40 0
2013-05-09 Multi-Stage Fracture 3455.10 3455.20 0
2013-05-09 Multi-Stage Fracture 3380.90 3381.00 0
2013-05-09 Multi-Stage Fracture 3320.50 3320.60 0
2013-05-09 Multi-Stage Fracture 3246.30 3246.40 0
2013-05-09 Multi-Stage Fracture 3172.10 3172.20 0
2013-05-09 Multi-Stage Fracture 3111.70 3111.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-09 2013-05-09 1,949 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 84.2446 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 3.9075 N/A
Crystalline silica. quartz 14808-60-7 100 3.9075 N/A
Iron Oxide 1309-37-1 100 3.9075 N/A
Titanium Oxide 13463-67-7 100 3.9075 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 7.5145 N/A
Crystalline silica. quartz 14808-60-7 100 7.5145 N/A
Iron Oxide 1309-37-1 100 7.5145 N/A
Titanium Oxide 13463-67-7 100 7.5144 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0445 N/A
Water 7732-18-5 100 0.0445 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1848 N/A
Water 7732-18-5 100 0.1848 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 3.9294 N/A
Non-hazardous base ingredient(s) Not Available 100 3.9295 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0933 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0933 N/A
Water 7732-18-5 100 0.0933 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0811 N/A
Water 7732-18-5 100 0.0811 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-05-04 2013-05-05 Recycled Fracturing Water (treated at well site) 726
2013-05-06 2013-05-06 Surface Water - River 1306
2013-05-07 2013-05-07 Surface Water - River 600

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4986 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8739 0.0 0.0 0.0
2016 8771 0.0 0.0 0.0
2017 8732 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2003 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-04-18 No Incident Encountered 0.00 0.00
2013-05-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References