X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475110501000

Well Details

Well ID: 0475110501000
Loading map...
Location: 00/01-05-047-11W5/0
Location Alias: 00/01-05-47-11 W5M
Location Alias 2: 00/01-05-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 05
County/Municipality: Brazeau County
Well Name: SDEL HZ BRAZR 1-5-47-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0442819
License Date: 2012-01-13
License Status: Issued
Spud Date: 2012-02-07
Final Drill Date: 2012-02-16
Well Total Depth: 3381.00 m
Surface Hole Latitude: 53.021931
Surface Hole Longitude: -115.583739

For data sources see[1][2]

Well History

Date Event
2012-01-13 Obtained License
2012-02-07 Well Log Performed
2012-02-09 Surface Casing Operation Performed
2012-02-10 Direction Drilling Operation Performed - Horizontal
2012-02-13 Well Log Performed
2012-02-16 Finished Drilling
2012-02-16 Well Log Performed
2012-02-16 Well Mode changed to Drilled and Cased
2012-02-18 Production Casing Operation Performed
2012-02-18 Rig Released
2012-02-24 Well Log Performed
2012-03-02 Well Began Production
2012-03-02 Well Fluid changed to Crude Oil
2012-03-02 Well Mode changed to Pumping
2012-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-07 Perforation Treatment Performed - Open-Hole Completion
2012-03-08 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-07 Nabors Drilling Limited 26 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-10 1652.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-07 Open Hole/Barefoot Completion 3376.00 3381.00 0
2012-03-08 Multi-Stage Fracture 2867.60 2867.70 0
2012-03-08 Multi-Stage Fracture 2805.20 2805.30 0
2012-03-08 Multi-Stage Fracture 2755.00 2755.10 0
2012-03-08 Multi-Stage Fracture 2692.80 2692.90 0
2012-03-08 Multi-Stage Fracture 2630.60 2630.70 0
2012-03-08 Multi-Stage Fracture 2568.30 2568.40 0
2012-03-08 Multi-Stage Fracture 2505.70 2505.80 0
2012-03-08 Multi-Stage Fracture 2455.30 2455.40 0
2012-03-08 Multi-Stage Fracture 2392.30 2392.40 0
2012-03-08 Multi-Stage Fracture 2329.20 2329.30 0
2012-03-07 Multi-Stage Fracture 3353.20 3353.30 0
2012-03-08 Multi-Stage Fracture 2266.90 2267.00 0
2012-03-07 Multi-Stage Fracture 3296.10 3296.20 0
2012-03-07 Multi-Stage Fracture 3234.40 3234.50 0
2012-03-08 Multi-Stage Fracture 3172.90 3173.00 0
2012-03-08 Multi-Stage Fracture 3112.50 3112.60 0
2012-03-08 Multi-Stage Fracture 3052.70 3052.80 0
2012-03-08 Multi-Stage Fracture 2989.90 2990.00 0
2012-03-08 Multi-Stage Fracture 2928.90 2929.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6650 0.0 0.0 0.0
2013 7941 0.0 0.0 0.0
2014 8643 0.0 0.0 0.0
2015 8631 0.0 0.0 0.0
2016 8723 0.0 0.0 0.0
2017 8610 0.0 0.0 0.0
2018 4243 0.0 0.0 0.0
2019 2940 0.0 0.0 0.0
2020 1320 0.0 0.0 0.0

For data sources see[7]

References