X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475110102000

Well Details

Well ID: 0475110102000
Loading map...
Location: 00/02-01-047-11W5/0
Location Alias: 00/02-01-47-11 W5M
Location Alias 2: 00/02-01-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 01
County/Municipality: Brazeau County
Well Name: SDEL HZ PEMBINA 2-1-47-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0447820
License Date: 2012-08-16
License Status: Issued
Spud Date: 2012-09-22
Final Drill Date: 2012-10-03
Well Total Depth: 3533.00 m
Surface Hole Latitude: 53.035279
Surface Hole Longitude: -115.468135

For data sources see[1][2]

Well History

Date Event
2012-08-16 Obtained License
2012-09-24 Surface Casing Operation Performed
2012-09-25 Direction Drilling Operation Performed - Deviate
2012-09-27 Direction Drilling Operation Performed - Horizontal
2012-09-27 Well Log Performed
2012-10-03 Finished Drilling
2012-10-03 Well Log Performed
2012-10-03 Well Mode changed to Drilled and Cased
2012-10-04 Production Casing Operation Performed
2012-10-04 Rig Released
2012-12-08 Well Log Performed
2012-12-12 Well Began Production
2012-12-12 Well Fluid changed to Crude Oil
2012-12-12 Well Mode changed to Pumping
2012-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-15 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-22 Nabors Drilling Limited 32 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-25 868.00 Deviate (5 - 79 degrees)
2012-09-27 2141.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-15 Open Hole/Barefoot Completion 3531.00 3533.00 0
2012-12-15 Multi-Stage Fracture 2912.20 2912.30 0
2012-12-15 Multi-Stage Fracture 2850.90 2851.00 0
2012-12-15 Multi-Stage Fracture 2775.50 2775.60 0
2012-12-15 Multi-Stage Fracture 2701.70 2701.80 0
2012-12-15 Multi-Stage Fracture 2626.60 2626.70 0
2012-12-15 Multi-Stage Fracture 2551.80 2551.90 0
2012-12-15 Multi-Stage Fracture 2477.30 2477.40 0
2012-12-15 Multi-Stage Fracture 2415.80 2415.90 0
2012-12-15 Multi-Stage Fracture 2340.70 2340.80 0
2012-12-15 Multi-Stage Fracture 2271.10 2271.20 0
2012-12-15 Multi-Stage Fracture 3502.80 3502.90 0
2012-12-15 Multi-Stage Fracture 2196.80 2196.90 0
2012-12-15 Multi-Stage Fracture 3421.00 3421.10 0
2012-12-15 Multi-Stage Fracture 3346.10 3346.20 0
2012-12-15 Multi-Stage Fracture 3285.20 3285.30 0
2012-12-15 Multi-Stage Fracture 3211.70 3211.80 0
2012-12-15 Multi-Stage Fracture 3137.30 3137.40 0
2012-12-15 Multi-Stage Fracture 3062.20 3062.30 0
2012-12-15 Multi-Stage Fracture 2987.10 2987.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 288 0.0 0.0 0.0
2013 6255 0.0 0.0 0.0
2014 7667 0.0 0.0 0.0
2015 6171 0.0 0.0 0.0
2016 8693 0.0 0.0 0.0
2017 7834 0.0 0.0 0.0
2018 7911 0.0 0.0 0.0
2019 2988 0.0 0.0 0.0
2020 2030 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-04 No Incident Encountered 0.00 0.00
2012-12-23 No Incident Encountered 0.00 0.00

For data sources see[8]

References