X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475103308000

Well Details

Well ID: 0475103308000
Loading map...
Location: 00/08-33-047-10W5/0
Location Alias: 00/08-33-47-10 W5M
Location Alias 2: 00/08-33-047-10 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 10
Section: 33
County/Municipality: Brazeau County
Well Name: AMOCO PEMBINA 8-33-47-10
Operator Name: Obsidian Energy Ltd.
License Number: 0010941
License Date: 1956-02-10
License Status: Issued
Spud Date: 1956-02-22
Final Drill Date: 1956-03-10
Well Total Depth: 1792.20 m
Surface Hole Latitude: 53.096498
Surface Hole Longitude: -115.393747

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-02-10 Obtained License
1956-03-10 Finished Drilling
1956-03-10 Well Mode changed to Drilled and Cased
1956-03-13 Perforation Treatment Performed - Bullet Perforation
1956-03-13 Production Casing Operation Performed
1956-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-05-25 Perforation Treatment Performed - Fractured
1956-06-23 Well Began Production
1956-06-23 Well Fluid changed to Crude Oil
1956-06-23 Well Mode changed to Flowing
1956-08-08 Well Fluid changed to Crude Oil
1956-08-08 Well Mode changed to Pumping
1963-05-17 Perforation Treatment Performed - Fractured
1978-11-02 Perforation Treatment Performed - Fractured
1989-11-02 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-03-13 Bullet Perforation 1770.90 1773.30 20
1956-03-13 Bullet Perforation 1768.10 1769.70 20
1956-03-13 Bullet Perforation 1766.30 1767.50 20
1956-05-25 Acid Treatment 1766.30 1773.30 0
1956-05-25 Fracture 1766.30 1773.30 0
1963-05-17 Fracture 1766.30 1773.30 0
1978-11-02 Fracture 1766.30 1773.30 0
1989-11-02 Chemical Squeeze 1766.30 1773.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8615 0.0 0.0 0.0
1968 7895 0.0 0.0 0.0
1969 7535 0.0 0.0 0.0
1970 7415 0.0 0.0 0.0
1971 7560 0.0 0.0 0.0
1972 7488 0.0 0.0 0.0
1973 7704 0.0 0.0 0.0
1974 8423 0.0 0.0 0.0
1975 8255 0.0 0.0 0.0
1976 8587 0.0 0.0 0.0
1977 8567 0.0 0.0 0.0
1978 8183 0.0 0.0 0.0
1979 7200 0.0 0.0 0.0
1980 8255 0.0 0.0 0.0
1981 8351 0.0 0.0 0.0
1982 8540 0.0 0.0 0.0
1983 8424 0.0 0.0 0.0
1984 8519 0.0 0.0 0.0
1985 8328 0.0 0.0 0.0
1986 8687 0.0 0.0 0.0
1987 8615 0.0 0.0 0.0
1988 8355 0.0 0.0 0.0
1989 8447 0.0 0.0 0.0
1990 8663 0.0 0.0 0.0
1991 8250 0.0 0.0 0.0
1992 8657 0.0 0.0 0.0
1993 7215 0.0 0.0 0.0
1994 8375 0.0 0.0 0.0
1995 8603 0.0 0.0 0.0
1996 8584 0.0 0.0 0.0
1997 8399 0.0 0.0 0.0
1998 8327 0.0 0.0 0.0
1999 8316 0.0 0.0 0.0
2000 8719 0.0 0.0 0.0
2001 8735 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 7847 0.0 0.0 0.0
2004 8471 0.0 0.0 0.0
2005 8615 0.0 0.0 0.0
2006 8616 0.0 0.0 0.0
2007 8015 0.0 0.0 0.0
2008 8612 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8616 0.0 0.0 0.0
2011 8345 0.0 0.0 0.0
2012 4164 0.0 0.0 0.0
2013 8147 0.0 0.0 0.0
2014 1458 0.0 0.0 0.0
2015 5592 0.0 0.0 0.0
2016 7511 0.0 0.0 0.0
2017 6852 0.0 0.0 0.0
2018 8349 0.0 0.0 0.0
2019 8271 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[5]

References