X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475102303040

Well Details

Well ID: 0475102303040
Loading map...
Location: 04/03-23-047-10W5/0
Location Alias: 04/03-23-47-10 W5M
Location Alias 2: 04/03-23-047-10 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 10
Section: 23
County/Municipality: Brazeau County
Well Name: BONTERRA 104 HZ PEMBINA 3-23-47-10
Operator Name: Bonterra Energy Corp.
License Number: 0479360
License Date: 2016-04-29
License Status: Issued
Spud Date: 2016-06-09
Final Drill Date: 2016-06-17
Well Total Depth: 3460.00 m
Surface Hole Latitude: 53.077614
Surface Hole Longitude: -115.361597

For data sources see[1][2]

Well History

Date Event
2016-04-29 Obtained License
2016-06-10 Surface Casing Operation Performed
2016-06-11 Direction Drilling Operation Performed - Deviate
2016-06-13 Direction Drilling Operation Performed - Horizontal
2016-06-17 Finished Drilling
2016-06-17 Well Log Performed
2016-06-17 Well Mode changed to Drilled and Cased
2016-06-19 Production Casing Operation Performed
2016-06-19 Rig Released
2016-06-25 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-26 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-01 Well Began Production
2016-07-01 Well Fluid changed to Crude Oil
2016-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-06-09 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-06-11 729.30 Deviate (5 - 79 degrees)
2016-06-13 2006.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-06-25 Multi-Stage Fracture 3408.50 3409.10 0
2016-06-25 Multi-Stage Fracture 2923.40 2925.30 0
2016-06-25 Multi-Stage Fracture 2869.50 2871.40 0
2016-06-25 Multi-Stage Fracture 2812.70 2814.60 0
2016-06-25 Multi-Stage Fracture 2758.40 2760.30 0
2016-06-25 Multi-Stage Fracture 2705.30 2707.20 0
2016-06-25 Multi-Stage Fracture 2649.70 2651.60 0
2016-06-25 Multi-Stage Fracture 2595.50 2597.40 0
2016-06-25 Multi-Stage Fracture 2540.60 2542.50 0
2016-06-26 Multi-Stage Fracture 2473.50 2475.40 0
2016-06-26 Multi-Stage Fracture 2419.80 2421.60 0
2016-06-25 Multi-Stage Fracture 3359.50 3361.30 0
2016-06-26 Multi-Stage Fracture 2364.40 2366.30 0
2016-06-26 Multi-Stage Fracture 2308.60 2310.50 0
2016-06-26 Multi-Stage Fracture 2253.10 2254.90 0
2016-06-26 Multi-Stage Fracture 2197.20 2199.10 0
2016-06-26 Multi-Stage Fracture 2143.10 2145.00 0
2016-06-26 Multi-Stage Fracture 2089.30 2091.20 0
2016-06-26 Multi-Stage Fracture 2034.10 2036.00 0
2016-06-25 Multi-Stage Fracture 3307.40 3309.30 0
2016-06-25 Multi-Stage Fracture 3257.60 3259.50 0
2016-06-25 Multi-Stage Fracture 3204.40 3206.30 0
2016-06-25 Multi-Stage Fracture 3150.60 3152.40 0
2016-06-25 Multi-Stage Fracture 3097.80 3099.70 0
2016-06-25 Multi-Stage Fracture 3045.00 3046.90 0
2016-06-25 Multi-Stage Fracture 2991.20 2993.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-06-25 2016-06-26 1,862 2,608 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.8627 N/A
water Not Available 100 56.6344 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 9.2915 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 4.045 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0107 N/A
dibromoacetonitrile 3252-43-5 100 0.0107 N/A
non-hazardous ingredients Not Available 100 0.0107 N/A
polyethylene glycol 25322-68-3 100 0.0107 N/A
sodium bromide 7647-15-6 100 0.0107 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1626 N/A
non-hazardous ingredients Not Available 100 0.1626 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0032 N/A
potassium iodide 7681-11-0 100 0.0032 N/A
propargyl alcohol 107-19-7 100 0.0032 N/A
propargyl alcohol derivative 9393 100 0.0032 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0907 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0907 N/A
non-hazardous ingredients Not Available 100 0.0907 N/A
IC-3 Trican Iron Control sodium nitrilo-triacetate. monohydrate 18662-53-8 100 0.004 N/A
ASA-61 Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.009 N/A
benzenesulfonic acid. decyl(sulfophenoxy)-. disodium salt 36445-71-3 100 0.009 N/A
dipropylene glycol 25265-71-8 100 0.009 N/A
non-hazardous ingredients Not Available 100 0.009 N/A
S-17 Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0461 N/A
water Not Available 100 0.0461 N/A
S-4W Trican Surfactant diethanolamine 111-42-2 100 0.0078 N/A
fatty acid alkanolamide 68603-42-9 100 0.0078 N/A
fatty acids. coco. compds. with diethanolamine 61790-63-4 100 0.0078 N/A
methanol 67-56-1 100 0.0078 N/A
phosphoric acid. mixed decyl and
octyl esters. compds. with diethanolamine
68425-57-0 100 0.0078 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-06-22 2016-06-24 Surface Water - River 2777

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 4283 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-19 No Incident Encountered 0.00 0.00
2016-06-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References