X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475092508000

Well Details

Well ID: 0475092508000
Loading map...
Location: 00/08-25-047-09W5/0
Location Alias: 00/08-25-47-09 W5M
Location Alias 2: 00/08-25-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 25
County/Municipality: Brazeau County
Well Name: PENN WEST PEMBINA 8-25-47-9
Operator Name: Obsidian Energy Ltd.
License Number: 0009707
License Date: 1955-07-12
License Status: Suspension
Spud Date: 1955-07-23
Final Drill Date: 1955-08-12
Well Total Depth: 1702.30 m
Surface Hole Latitude: 53.081165
Surface Hole Longitude: -115.174576

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-07-12 Obtained License
1955-08-12 Finished Drilling
1955-08-12 Production Casing Operation Performed
1955-08-12 Well Mode changed to Drilled and Cased
1955-08-18 Perforation Treatment Performed - Acid Wash - No Pressure
1955-08-18 Perforation Treatment Performed - Jet Perforation
1955-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-21 Perforation Treatment Performed - Fractured
1955-08-21 Perforation Treatment Performed - Jet Perforation
1955-08-23 Well Began Production
1955-08-23 Well Fluid changed to Crude Oil
1955-08-23 Well Mode changed to Flowing
1956-03-04 Perforation Treatment Performed - Fractured
1958-12-01 Well Began Injection
1958-12-01 Well Fluid changed to Water
1958-12-01 Well Type changed to Injection
1992-10-18 Perforation Treatment Performed - Chemical Squeeze
1992-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-11-01 Well Fluid changed to Water
2017-11-01 Well Mode changed to Suspended
2017-11-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-08-18 Perforation 1678.50 1681.60 13
1955-08-18 Acid Wash 1678.50 1681.60 0
1955-08-20 Acid Treatment 1678.50 1681.60 0
1955-08-21 Fracture 1678.50 1681.60 0
1955-08-21 Perforation 1670.90 1674.00 13
1956-03-04 Fracture 1670.90 1681.60 0
1992-10-18 Chemical Squeeze 1670.90 1681.60 0
1992-10-20 Acid Treatment 1670.90 1681.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0

For data sources see[5]

References