X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475091606000

Well Details

Well ID: 0475091606000
Loading map...
Location: 00/06-16-047-09W5/0
Location Alias: 00/06-16-47-09 W5M
Location Alias 2: 00/06-16-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 16
County/Municipality: Brazeau County
Well Name: MARATHON PEMBINA IN 6-16-47-9
Operator Name: Obsidian Energy Ltd.
License Number: 0015483
License Date: 1958-07-03
License Status: Issued
Spud Date: 1958-07-08
Final Drill Date: 1958-07-18
Well Total Depth: 1756.30 m
Surface Hole Latitude: 53.052432
Surface Hole Longitude: -115.260210

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-07-03 Obtained License
1958-07-18 Finished Drilling
1958-07-18 Well Mode changed to Drilled and Cased
1958-07-19 Production Casing Operation Performed
1958-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-10-16 Perforation Treatment Performed - Fractured
1958-10-16 Perforation Treatment Performed - Jet Perforation
1958-11-01 Well Began Production
1958-11-01 Well Fluid changed to Crude Oil
1958-11-01 Well Mode changed to Flowing
1962-08-09 Well Began Injection
1962-08-09 Well Fluid changed to Water
1962-08-09 Well Type changed to Injection
1971-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-15 Well Fluid changed to Water
1996-03-15 Well Mode changed to Suspended
1996-03-15 Well Type changed to Injection
2003-10-01 Well Fluid changed to Water
2003-10-01 Well Type changed to Injection
2007-05-01 Well Fluid changed to Water
2007-05-01 Well Mode changed to Suspended
2007-05-01 Well Type changed to Injection
2007-06-01 Well Fluid changed to Water
2007-06-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-16 Perforation 1717.90 1720.60 13
1958-10-16 Perforation 1723.30 1726.70 13
1958-10-16 Acid Treatment 1717.90 1726.70 0
1958-10-16 Fracture 1717.90 1726.70 0
1971-02-10 Acid Treatment 1717.90 1726.70 0
1977-06-13 Acid Treatment 1717.90 1726.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References