X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475091216000

Well Details

Well ID: 0475091216000
Loading map...
Location: 00/16-12-047-09W5/0
Location Alias: 00/16-12-47-09 W5M
Location Alias 2: 00/16-12-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 12
County/Municipality: Clearwater County
Well Name: CIGOL PEMBINA IN 16-12-47-9
Operator Name: Bonterra Energy Corp.
License Number: 0016648
License Date: 1959-02-02
License Status: Suspension
Spud Date: 1959-02-08
Final Drill Date: 1959-02-18
Well Total Depth: 1600.50 m
Surface Hole Latitude: 53.045004
Surface Hole Longitude: -115.174954

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-02-02 Obtained License
1959-02-18 Finished Drilling
1959-02-18 Production Casing Operation Performed
1959-02-18 Well Mode changed to Drilled and Cased
1959-02-22 Perforation Treatment Performed - Jet Perforation
1959-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-02-23 Perforation Treatment Performed - Fractured
1959-03-05 Well Began Production
1959-03-05 Well Fluid changed to Crude Oil
1959-03-05 Well Mode changed to Flowing
1963-02-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-02-13 Perforation Treatment Performed - Fractured
1969-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-08 Perforation Treatment Performed - Fractured
1969-03-08 Perforation Treatment Performed - Selective Jet Perforations
1969-03-10 Well Began Injection
1969-03-10 Well Fluid changed to Water
1969-03-10 Well Type changed to Injection
1989-03-08 Well Fluid changed to Water
1989-03-08 Well Mode changed to Suspended
1989-03-08 Well Type changed to Injection
1989-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-02-22 Perforation 1569.40 1573.10 13
1969-03-08 Acid Treatment 1560.30 1563.60 0
1969-03-08 Fracture 1560.30 1563.60 0
1989-08-31 Packing Device Capped w/Cement 1524.00 1532.00 0
1989-09-01 Packing Device Capped w/Cement 752.00 760.00 0
1959-02-23 Acid Treatment 1569.40 1573.10 0
1959-02-23 Fracture 1569.40 1573.10 0
1963-02-13 Packing Device Capped w/Cement 1569.40 1573.10 0
1963-02-13 Hydra Jet Perforation 1560.30 1562.10 0
1963-02-13 Fracture 1560.30 1562.10 0
1969-03-08 Selective Jet Perforations 1560.30 1560.60 0
1969-03-08 Selective Jet Perforations 1561.20 1561.20 0
1969-03-08 Selective Jet Perforations 1562.10 1563.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

References