X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475091014020

Well Details

Well ID: 0475091014020
Loading map...
Location: 02/14-10-047-09W5/0
Location Alias: 02/14-10-47-09 W5M
Location Alias 2: 02/14-10-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 10
County/Municipality: Brazeau County
Well Name: FIND ET AL PEM 14-10-47-9
Operator Name: TAQA North Ltd.
License Number: 0338051
License Date: 2005-09-13
License Status: Abandoned
Spud Date: 2005-11-07
Final Drill Date: 2005-11-13
Well Total Depth: 2232.00 m
Surface Hole Latitude: 53.043683
Surface Hole Longitude: -115.237504

For data sources see[1][2]

Well History

Date Event
2005-09-13 Obtained License
2005-11-07 Production Casing Operation Performed
2005-11-07 Surface Casing Operation Performed
2005-11-13 Finished Drilling
2005-11-13 Well Log Performed
2005-11-13 Well Mode changed to Drilled and Cased
2005-11-14 Well Log Performed
2005-11-15 Rig Released
2005-11-22 Well Log Performed
2005-11-24 Well Log Performed
2005-11-25 Perforation Treatment Performed - Jet Perforation
2005-11-27 Perforation Treatment Performed - Fractured
2006-01-11 Well Log Performed
2006-01-12 Perforation Treatment Performed - Jet Perforation
2006-01-13 Perforation Treatment Performed - Fractured
2015-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-07 Plug Back Performed
2015-03-07 Well Log Performed
2015-03-07 Well Mode changed to Abandoned Zone
2015-03-08 Well Log Performed
2015-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-10 Perforation Treatment Performed - Jet Perforation
2015-03-10 Well Log Performed
2015-03-16 Perforation Treatment Performed - Jet Perforation
2015-03-16 Well Log Performed
2015-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-17 Perforation Treatment Performed - Cement Squeeze
2015-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-18 Perforation Treatment Performed - Cement Squeeze
2015-03-18 Perforation Treatment Performed - Jet Perforation
2015-03-18 Well Log Performed
2015-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-19 Perforation Treatment Performed - Cement Plug
2015-03-19 Perforation Treatment Performed - Cement Squeeze
2015-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-20 Perforation Treatment Performed - Cement Squeeze
2015-03-20 Perforation Treatment Performed - Jet Perforation
2015-03-20 Well Log Performed
2015-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-21 Perforation Treatment Performed - Cement Plug
2015-03-21 Perforation Treatment Performed - Cement Squeeze
2015-03-21 Perforation Treatment Performed - Jet Perforation
2015-03-21 Well Log Performed
2015-06-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-25 Perforation 2077.00 2079.00 17
2015-03-17 Packing Device Capped w/Cement 851.00 862.00 0
2015-03-17 Cement Squeeze 864.00 870.00 0
2015-03-18 Cement Squeeze 700.00 702.00 0
2015-03-18 Packing Device Capped w/Cement 702.00 705.00 0
2015-03-18 Perforation 700.00 702.00 17
2015-03-19 Packing Device Capped w/Cement 527.00 536.00 0
2015-03-19 Packing Device Capped w/Cement 542.00 542.60 0
2015-03-19 Cement Plug 542.70 700.00 0
2015-03-19 Cement Squeeze 539.00 541.00 0
2015-03-20 Packing Device Capped w/Cement 474.00 477.00 0
2005-11-27 Fracture 2077.00 2079.00 0
2015-03-20 Cement Squeeze 472.00 474.00 0
2015-03-20 Perforation 472.00 474.00 17
2015-03-21 Cement Plug 407.00 457.00 0
2015-03-21 Packing Device Capped w/Cement 459.00 470.00 0
2015-03-21 Perforation 457.00 459.00 17
2015-03-21 Cement Squeeze 457.00 459.00 0
2006-01-12 Perforation 1810.00 1814.00 17
2006-01-13 Fracture 1810.00 1814.00 0
2015-03-07 Packing Device Capped w/Cement 1791.50 1800.20 0
2015-03-07 Packing Device Capped w/Cement 2054.00 2062.50 0
2015-03-10 Packing Device Capped w/Cement 870.00 874.00 0
2015-03-10 Perforation 864.00 870.00 35
2015-03-16 Perforation 539.00 541.00 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-04 No Incident Encountered 0.00 0.00
2015-03-07 No Incident Encountered 0.00 0.00

For data sources see[5]

References