If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475090713000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.031912,"lon":-115.310031,"icon":""}]} |
Location: 00/13-07-047-09W5/0 | |
Location Alias: 00/13-07-47-09 W5M | |
Location Alias 2: 00/13-07-047-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 09 | |
Section: 07 | |
County/Municipality: Brazeau County | |
Well Name: TQN ET AL HZ PEMBINA 13-7-47-9 | |
Operator Name: TAQA North Ltd. | |
License Number: 0432992 | |
License Date: 2011-04-13 | |
License Status: Amended | |
Spud Date: 2011-10-19 | |
Final Drill Date: 2011-11-05 | |
Well Total Depth: 3530.00 m | |
Surface Hole Latitude: 53.031912 | |
Surface Hole Longitude: -115.310031 |
Date | Event |
---|---|
2011-04-13 | Obtained License |
2011-10-21 | Surface Casing Operation Performed |
2011-10-23 | Well Log Performed |
2011-10-26 | Direction Drilling Operation Performed - Deviate |
2011-10-27 | Direction Drilling Operation Performed - Horizontal |
2011-10-30 | Intermediate Casing Operation Performed |
2011-11-05 | Finished Drilling |
2011-11-05 | Well Mode changed to Drilled and Cased |
2011-11-09 | Liner Casing Operation Performed |
2011-11-10 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-10 | Rig Released |
2011-11-19 | Well Log Performed |
2011-11-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-30 | Well Began Production |
2012-01-30 | Well Fluid changed to Gas |
2012-01-30 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-26 | 1861.70 | Deviate (5 - 79 degrees) |
2011-10-27 | 2275.70 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-10 | Open Hole/Barefoot Completion | 3526.00 | 3530.00 | 0 |
2011-11-27 | Multi-Stage Fracture | 3340.50 | 3461.10 | 0 |
2011-11-27 | Multi-Stage Fracture | 3479.60 | 3530.00 | 0 |
2011-11-27 | Multi-Stage Fracture | 2323.80 | 2454.00 | 0 |
2011-11-27 | Multi-Stage Fracture | 2454.00 | 2574.60 | 0 |
2011-11-27 | Multi-Stage Fracture | 2574.60 | 2708.00 | 0 |
2011-11-27 | Multi-Stage Fracture | 2708.00 | 2828.50 | 0 |
2011-11-27 | Multi-Stage Fracture | 2828.50 | 2964.10 | 0 |
2011-11-27 | Multi-Stage Fracture | 2964.10 | 3084.70 | 0 |
2011-11-27 | Multi-Stage Fracture | 3084.70 | 3205.00 | 0 |
2011-11-27 | Multi-Stage Fracture | 3205.00 | 3340.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7557 | 0.0 | 0.0 | 0.0 |
2013 | 8213 | 0.0 | 0.0 | 0.0 |
2014 | 8128 | 0.0 | 0.0 | 0.0 |
2015 | 7969 | 0.0 | 0.0 | 0.0 |
2016 | 8167 | 0.0 | 0.0 | 0.0 |
2017 | 7973 | 0.0 | 0.0 | 0.0 |
2018 | 8548 | 0.0 | 0.0 | 0.0 |
2019 | 8330 | 0.0 | 0.0 | 0.0 |
2020 | 1994 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-12-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]