X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475090314000

Well Details

Well ID: 0475090314000
Loading map...
Location: 00/14-03-047-09W5/0
Location Alias: 00/14-03-47-09 W5M
Location Alias 2: 00/14-03-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 03
County/Municipality: Brazeau County
Well Name: PAN AM HUDSON'S BAY BLUE RAPIDS D-15
Operator Name: Obsidian Energy Ltd.
License Number: 0010563
License Date: 1955-12-02
License Status: Suspension
Spud Date: 1956-01-04
Final Drill Date: 1956-02-02
Well Total Depth: 1713.00 m
Surface Hole Latitude: 53.030560
Surface Hole Longitude: -115.235771

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-12-02 Obtained License
1956-02-02 Finished Drilling
1956-02-02 Perforation Treatment Performed - Jet Perforation
1956-02-02 Production Casing Operation Performed
1956-02-02 Well Mode changed to Drilled and Cased
1956-02-07 Perforation Treatment Performed - Fractured
1956-02-17 Well Began Production
1956-02-17 Well Fluid changed to Crude Oil
1956-02-17 Well Mode changed to Flowing
1963-03-14 Well Fluid changed to Crude Oil
1963-03-14 Well Mode changed to Pumping
1964-05-25 Perforation Treatment Performed - Fractured
1973-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-02 Well Began Injection
1973-02-02 Well Fluid changed to Water
1973-02-02 Well Type changed to Injection
1997-01-01 Well Fluid changed to Water
1997-01-01 Well Mode changed to Suspended
1997-01-01 Well Type changed to Injection
2008-02-02 Well Log Performed
2008-02-03 Well Log Performed
2008-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-02-02 Perforation 1677.00 1680.70 26
1956-02-02 Perforation 1682.50 1686.20 26
1956-02-07 Fracture 1677.00 1686.20 0
1964-05-25 Fracture 1677.00 1686.20 0
1973-02-01 Acid Treatment 1677.00 1686.20 0
2008-02-04 Packing Device Capped w/Cement 1572.00 1580.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2574 0.0 0.0 0.0
1968 2508 0.0 0.0 0.0
1969 4439 0.0 0.0 0.0
1971 1728 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0

For data sources see[5]

References