If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475090106002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.023394,"lon":-115.186988,"icon":""}]} |
Location: 00/06-01-047-09W5/2 | |
Location Alias: 00/06-01-47-09 W5M | |
Location Alias 2: 00/06-01-047-09 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 09 | |
Section: 01 | |
County/Municipality: Clearwater County | |
Well Name: BONTERRA ET AL PEMBINA 6-1-47-9 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0017050 | |
License Date: 1959-05-13 | |
License Status: Suspension | |
Spud Date: 1959-07-04 | |
Final Drill Date: 1959-07-16 | |
Well Total Depth: 1691.60 m | |
Surface Hole Latitude: 53.023394 | |
Surface Hole Longitude: -115.186988 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1959-05-13 | Obtained License |
1959-07-16 | Finished Drilling |
1959-07-16 | Production Casing Operation Performed |
1959-07-16 | Well Mode changed to Drilled and Cased |
1959-07-20 | Perforation Treatment Performed - Acid Wash - No Pressure |
1959-07-20 | Perforation Treatment Performed - Jet Perforation |
1959-07-23 | Perforation Treatment Performed - Fractured |
1975-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1975-09-12 | Perforation Treatment Performed - Jet Perforation |
1975-09-14 | Perforation Treatment Performed - Cement Squeeze |
1975-09-15 | Perforation Treatment Performed - Jet Perforation |
1975-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-09-16 | Perforation Treatment Performed - Acid Wash - No Pressure |
1975-09-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-09-21 | Well Began Production |
1975-09-21 | Well Fluid changed to Crude Oil |
1975-09-21 | Well Mode changed to Flowing |
1976-02-25 | Perforation Treatment Performed - Fractured |
1988-11-02 | Well Fluid changed to Crude Oil |
1988-11-02 | Well Mode changed to Suspended |
1992-06-19 | Well Fluid changed to Crude Oil |
1992-06-19 | Well Mode changed to Pumping |
1992-09-01 | Well Fluid changed to Crude Oil |
1992-09-01 | Well Mode changed to Suspended |
2004-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-12-06 | Plug Back Performed |
2004-12-06 | Well Fluid changed to Crude Oil |
2004-12-06 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-07-20 | Perforation | 1656.30 | 1661.20 | 13 |
1975-09-16 | Acid Wash | 1293.30 | 1297.50 | 0 |
1975-09-16 | Acid Treatment | 1293.30 | 1297.50 | 0 |
1975-09-17 | Acid Treatment | 1293.30 | 1297.50 | 0 |
1976-02-25 | Fracture | 1293.30 | 1297.50 | 0 |
2004-12-06 | Packing Device Capped w/Cement | 1282.00 | 1290.50 | 0 |
1959-07-20 | Perforation | 1667.30 | 1669.40 | 13 |
1959-07-20 | Acid Wash | 1656.30 | 1669.40 | 0 |
1959-07-23 | Fracture | 1656.30 | 1669.40 | 0 |
1975-09-12 | Packing Device Capped w/Cement | 1641.30 | 1649.00 | 0 |
1975-09-12 | Perforation | 1308.80 | 1309.40 | 7 |
1975-09-14 | Cement Squeeze | 1308.80 | 1309.40 | 0 |
1975-09-15 | Perforation | 1293.30 | 1295.40 | 3 |
1975-09-15 | Perforation | 1296.90 | 1297.50 | 3 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 1694 | 0.0 | 0.0 | 0.0 |
1976 | 7314 | 0.0 | 0.0 | 0.0 |
1977 | 8447 | 0.0 | 0.0 | 0.0 |
1978 | 8639 | 0.0 | 0.0 | 0.0 |
1979 | 7799 | 0.0 | 0.0 | 0.0 |
1980 | 8711 | 0.0 | 0.0 | 0.0 |
1981 | 8591 | 0.0 | 0.0 | 0.0 |
1982 | 8471 | 0.0 | 0.0 | 0.0 |
1983 | 5519 | 0.0 | 0.0 | 0.0 |
1984 | 7678 | 0.0 | 0.0 | 0.0 |
1985 | 7566 | 0.0 | 0.0 | 0.0 |
1986 | 6599 | 0.0 | 0.0 | 0.0 |
1987 | 8350 | 0.0 | 0.0 | 0.0 |
1988 | 4915 | 0.0 | 0.0 | 0.0 |
1989 | 2688 | 0.0 | 0.0 | 0.0 |
1992 | 350 | 0.0 | 0.0 | 0.0 |
For data sources see[5]