X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475083516030

Well Details

Well ID: 0475083516030
Loading map...
Location: 03/16-35-047-08W5/0
Location Alias: 03/16-35-47-08 W5M
Location Alias 2: 03/16-35-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 35
County/Municipality: Brazeau County
Well Name: BONTERRA 103 HZ PEMBINA 16-35-47-8
Operator Name: Bonterra Energy Corp.
License Number: 0481829
License Date: 2016-12-13
License Status: Issued
Spud Date: 2017-01-04
Final Drill Date: 2017-01-09
Well Total Depth: 3192.00 m
Surface Hole Latitude: 53.102510
Surface Hole Longitude: -115.077386

For data sources see[1][2]

Well History

Date Event
2016-12-13 Obtained License
2017-01-05 Surface Casing Operation Performed
2017-01-06 Direction Drilling Operation Performed - Deviate
2017-01-07 Direction Drilling Operation Performed - Horizontal
2017-01-09 Finished Drilling
2017-01-09 Well Mode changed to Drilled and Cased
2017-01-10 Production Casing Operation Performed
2017-01-10 Well Log Performed
2017-01-11 Rig Released
2017-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-01 Well Began Production
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-04 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-06 1245.00 Deviate (5 - 79 degrees)
2017-01-07 1753.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-18 Multi-Stage Fracture 3153.90 3154.50 0
2017-03-18 Multi-Stage Fracture 2670.90 2672.80 0
2017-03-18 Multi-Stage Fracture 2618.10 2620.00 0
2017-03-18 Multi-Stage Fracture 2564.10 2566.00 0
2017-03-18 Multi-Stage Fracture 2509.70 2511.60 0
2017-03-18 Multi-Stage Fracture 2468.20 2470.10 0
2017-03-18 Multi-Stage Fracture 2414.50 2416.40 0
2017-03-18 Multi-Stage Fracture 2360.40 2362.30 0
2017-03-18 Multi-Stage Fracture 2307.20 2309.10 0
2017-03-18 Multi-Stage Fracture 2253.30 2255.20 0
2017-03-18 Multi-Stage Fracture 2200.50 2202.40 0
2017-03-18 Multi-Stage Fracture 3102.20 3104.10 0
2017-03-18 Multi-Stage Fracture 2146.40 2148.30 0
2017-03-18 Multi-Stage Fracture 2092.70 2094.60 0
2017-03-18 Multi-Stage Fracture 2039.30 2041.20 0
2017-03-18 Multi-Stage Fracture 1985.10 1987.00 0
2017-03-19 Multi-Stage Fracture 1930.90 1932.80 0
2017-03-19 Multi-Stage Fracture 1877.50 1879.40 0
2017-03-19 Multi-Stage Fracture 1823.50 1825.40 0
2017-03-19 Multi-Stage Fracture 1781.30 1783.20 0
2017-03-18 Multi-Stage Fracture 3048.40 3050.30 0
2017-03-18 Multi-Stage Fracture 2994.20 2996.10 0
2017-03-18 Multi-Stage Fracture 2940.50 2942.40 0
2017-03-18 Multi-Stage Fracture 2887.30 2889.20 0
2017-03-18 Multi-Stage Fracture 2832.90 2834.80 0
2017-03-18 Multi-Stage Fracture 2778.50 2780.40 0
2017-03-18 Multi-Stage Fracture 2724.90 2726.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-18 2017-03-19 1,596 2,704 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.6239 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 12.1888 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 5.0221 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0098 N/A
2-mercaptoethanol 60-24-2 100 0.0098 N/A
dibromoacetonitrile 3252-43-5 100 0.0098 N/A
non-hazardous ingredients Not Available 100 0.0098 N/A
sodium bromide 7647-15-6 100 0.0098 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0882 N/A
water Not Available 100 0.0882 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0421 N/A
propylene glycol 57-55-6 100 0.0421 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0247 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-03-17 2017-03-19 Surface Water - Runoff 2807

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6420 0.0 0.0 0.0
2018 8683 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-11 No Incident Encountered 0.00 0.00
2017-03-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References