X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475083404000

Well Details

Well ID: 0475083404000
Loading map...
Location: 00/04-34-047-08W5/0
Location Alias: 00/04-34-47-08 W5M
Location Alias 2: 00/04-34-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 34
County/Municipality: Brazeau County
Well Name: PAN AM-HUDSON'S BAY PEMBINA F-2
Operator Name: Obsidian Energy Ltd.
License Number: 0008013
License Date: 1954-05-11
License Status: Suspension
Spud Date: 1954-07-09
Final Drill Date: 1954-08-03
Well Total Depth: 1598.10 m
Surface Hole Latitude: 53.092228
Surface Hole Longitude: -115.095012

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-05-11 Obtained License
1954-07-29 Production Casing Operation Performed
1954-08-03 Finished Drilling
1954-08-03 Perforation Treatment Performed - Open-Hole Completion
1954-08-03 Well Mode changed to Drilled and Cased
1954-11-06 Perforation Treatment Performed - Fractured
1954-11-17 Well Began Production
1954-11-17 Well Fluid changed to Crude Oil
1954-11-17 Well Mode changed to Flowing
1955-08-08 Perforation Treatment Performed - Acid Wash - No Pressure
1955-08-08 Perforation Treatment Performed - Fractured
1961-02-07 Perforation Treatment Performed - Fractured
1961-02-18 Well Fluid changed to Crude Oil
1961-02-18 Well Mode changed to Pumping
1987-07-19 Well Fluid changed to Crude Oil
1987-07-19 Well Mode changed to Suspended
2011-03-14 Well Log Performed
2011-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-18 Plug Back Performed
2011-03-18 Well Fluid changed to Crude Oil
2011-03-18 Well Log Performed
2011-03-18 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-08-03 Open Hole/Barefoot Completion 1571.90 1598.10 0
1954-11-06 Fracture 1571.90 1598.10 0
1955-08-08 Acid Wash 1571.90 1598.10 0
1955-08-08 Fracture 1571.90 1598.10 0
1961-02-07 Fracture 1571.90 1598.10 0
2011-03-18 Packing Device Capped w/Cement 1552.00 1560.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6767 0.0 0.0 0.0
1968 7104 0.0 0.0 0.0
1969 8567 0.0 0.0 0.0
1970 8303 0.0 0.0 0.0
1971 8184 0.0 0.0 0.0
1972 8673 0.0 0.0 0.0
1973 7835 0.0 0.0 0.0
1974 8520 0.0 0.0 0.0
1975 7943 0.0 0.0 0.0
1976 7967 0.0 0.0 0.0
1977 5952 0.0 0.0 0.0
1978 8663 0.0 0.0 0.0
1979 8759 0.0 0.0 0.0
1980 8711 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8567 0.0 0.0 0.0
1983 8663 0.0 0.0 0.0
1984 7929 0.0 0.0 0.0
1985 7464 0.0 0.0 0.0
1986 7411 0.0 0.0 0.0
1987 1680 0.0 0.0 0.0

For data sources see[5]

References