X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475082408000

Well Details

Well ID: 0475082408000
Loading map...
Location: 00/08-24-047-08W5/0
Location Alias: 00/08-24-47-08 W5M
Location Alias 2: 00/08-24-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 24
County/Municipality: Brazeau County
Well Name: ENERPLUS PEMBINA 8-24-47-8
Operator Name: Bonterra Energy Corp.
License Number: 0011258
License Date: 1956-03-21
License Status: Suspension
Spud Date: 1956-06-14
Final Drill Date: 1956-07-11
Well Total Depth: 1580.40 m
Surface Hole Latitude: 53.066896
Surface Hole Longitude: -115.033051

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-03-21 Obtained License
1956-06-14 Direction Drilling Operation Performed - 98
1956-07-11 Finished Drilling
1956-07-11 Well Mode changed to Drilled and Cased
1956-07-12 Production Casing Operation Performed
1956-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-07-14 Perforation Treatment Performed - Fractured
1956-07-14 Perforation Treatment Performed - Jet Perforation
1956-07-20 Well Began Production
1956-07-20 Well Fluid changed to Crude Oil
1956-07-20 Well Mode changed to Flowing
1957-01-01 Well Began Injection
1957-01-01 Well Fluid changed to Water
1957-01-01 Well Type changed to Injection
1957-08-25 Perforation Treatment Performed - Jet Perforation
1957-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-07 Perforation Treatment Performed - Fractured
1959-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-20 Perforation Treatment Performed - Jet Perforation
1989-07-20 Well Log Performed
1989-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-07 Perforation Treatment Performed - Jet Perforation
2002-11-07 Plug Back Performed
2002-11-07 Well Fluid changed to Water
2002-11-07 Well Mode changed to Abandoned Zone
2002-11-07 Well Type changed to Injection
2002-11-08 Perforation Treatment Performed - Remedial Casing
2002-11-13 Perforation Treatment Performed - Jet Perforation
2002-11-18 Perforation Treatment Performed - Remedial Casing
2002-11-21 Perforation Treatment Performed - Fractured
2002-11-21 Perforation Treatment Performed - Jet Perforation
2009-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-18 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1956-06-14 796.10 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-07-14 Perforation 1542.90 1549.00 13
1958-05-07 Acid Treatment 1538.00 1549.00 0
1958-05-07 Fracture 1538.00 1549.00 0
1959-06-09 Acid Treatment 1538.00 1549.00 0
1959-09-25 Acid Treatment 1538.00 1549.00 0
1989-07-20 Perforation 1542.50 1548.50 13
1989-07-22 Acid Treatment 1538.00 1558.10 0
2002-11-07 Packing Device Capped w/Cement 1527.00 1535.00 0
2002-11-07 Perforation 338.00 338.60 20
2002-11-08 Remedial Casing Cementing 338.00 338.60 0
2002-11-13 Perforation 320.00 321.00 20
1956-07-14 Perforation 1553.30 1558.10 13
2002-11-13 Perforation 307.50 308.50 20
2002-11-18 Remedial Casing Cementing 307.50 321.00 0
2002-11-21 Perforation 310.50 313.00 20
2002-11-21 Perforation 314.50 318.00 20
2002-11-21 Fracture 310.50 318.00 0
2009-03-18 Packing Device Capped w/Cement 295.00 303.00 0
1956-07-14 Acid Treatment 1542.90 1558.10 0
1956-07-14 Fracture 1542.90 1558.10 0
1957-08-25 Perforation 1538.00 1540.40 13
1957-08-25 Perforation 1542.90 1543.80 7
1957-08-25 Perforation 1544.70 1547.20 7
1957-08-27 Acid Treatment 1538.00 1549.00 0
1957-10-03 Acid Treatment 1538.00 1549.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0

For data sources see[6]

References