X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475081802020

Well Details

Well ID: 0475081802020
Loading map...
Location: 02/02-18-047-08W5/0
Location Alias: 02/02-18-47-08 W5M
Location Alias 2: 02/02-18-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 18
County/Municipality: Clearwater County
Well Name: ARC HZ 102 PEMBINA 2-18-47-8
Operator Name: ARC Resources Ltd.
License Number: 0422523
License Date: 2010-08-10
License Status: Amended
Spud Date: 2010-09-08
Final Drill Date: 2010-09-18
Well Total Depth: 3013.00 m
Surface Hole Latitude: 53.042331
Surface Hole Longitude: -115.135681

For data sources see[1][2]

Well History

Date Event
2010-08-10 Obtained License
2010-09-09 Surface Casing Operation Performed
2010-09-10 Direction Drilling Operation Performed - Horizontal
2010-09-10 Well Log Performed
2010-09-13 Intermediate Casing Operation Performed
2010-09-18 Finished Drilling
2010-09-18 Well Mode changed to Drilled and Cased
2010-09-20 Liner Casing Operation Performed
2010-09-21 Rig Released
2010-10-22 Perforation Treatment Performed - Open-Hole Completion
2010-10-25 Well Log Performed
2010-10-27 Perforation Treatment Performed - Fractured
2010-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-19 Well Began Production
2010-11-19 Well Fluid changed to Crude Oil
2010-11-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-09-10 1320.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-22 Open Hole/Barefoot Completion 1736.00 2991.00 0
2010-10-27 Multi-Stage Fracture 2692.30 2822.30 0
2010-10-27 Multi-Stage Fracture 2827.50 2956.40 0
2010-10-27 Multi-Stage Fracture 2961.50 2991.00 0
2010-10-27 Fracture 1807.20 2990.10 0
2010-10-27 Multi-Stage Fracture 1736.00 1866.70 0
2010-10-27 Multi-Stage Fracture 1871.80 1999.50 0
2010-10-27 Multi-Stage Fracture 2004.60 2134.50 0
2010-10-27 Multi-Stage Fracture 2139.60 2281.80 0
2010-10-27 Multi-Stage Fracture 2287.00 2417.30 0
2010-10-27 Multi-Stage Fracture 2422.40 2551.90 0
2010-10-27 Multi-Stage Fracture 2557.00 2687.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1464 0.0 0.0 0.0
2011 8581 0.0 0.0 0.0
2012 7471 0.0 0.0 0.0
2013 4910 0.0 0.0 0.0
2014 7824 0.0 0.0 0.0
2015 8450 0.0 0.0 0.0
2016 8144 0.0 0.0 0.0
2017 8305 0.0 0.0 0.0
2018 8032 0.0 0.0 0.0
2019 8171 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

References