X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475081606000

Well Details

Well ID: 0475081606000
Loading map...
Location: 00/06-16-047-08W5/0
Location Alias: 00/06-16-47-08 W5M
Location Alias 2: 00/06-16-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 16
County/Municipality: Clearwater County
Well Name: 562808 PEMBINA 6-16-47-8
Operator Name: Obsidian Energy Ltd.
License Number: 0013955
License Date: 1957-09-11
License Status: RecCertified
Spud Date: 1957-09-18
Final Drill Date: 1957-10-02
Well Total Depth: 1551.40 m
Surface Hole Latitude: 53.052426
Surface Hole Longitude: -115.113918

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-09-11 Obtained License
1957-10-02 Finished Drilling
1957-10-02 Well Mode changed to Drilled and Cased
1957-10-05 Production Casing Operation Performed
1957-10-07 Perforation Treatment Performed - Bullet Perforation
1957-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-10-08 Perforation Treatment Performed - Fractured
1957-10-15 Well Began Production
1957-10-15 Well Fluid changed to Crude Oil
1957-10-15 Well Mode changed to Flowing
1958-01-17 Well Fluid changed to Crude Oil
1958-01-17 Well Mode changed to Pumping
1960-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-06-22 Well Began Injection
1960-06-22 Well Fluid changed to Water
1960-06-22 Well Type changed to Injection
1967-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-01 Well Fluid changed to Water
1982-08-01 Well Mode changed to Suspended
1982-08-01 Well Type changed to Injection
1982-09-01 Well Fluid changed to Water
1982-09-01 Well Type changed to Injection
1998-02-01 Well Fluid changed to Water
1998-02-01 Well Mode changed to Suspended
1998-02-01 Well Type changed to Injection
2001-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-21 Plug Back Performed
2001-07-21 Well Fluid changed to Water
2001-07-21 Well Log Performed
2001-07-21 Well Mode changed to Abandoned Zone
2001-07-21 Well Type changed to Injection
2001-07-22 Perforation Treatment Performed - Jet Perforation
2001-07-22 Well Log Performed
2001-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-24 Perforation Treatment Performed - Remedial Casing
2001-07-25 Perforation Treatment Performed - Jet Perforation
2001-07-25 Well Log Performed
2001-07-26 Perforation Treatment Performed - Remedial Casing
2001-08-14 Perforation Treatment Performed - Jet Perforation
2001-08-14 Well Log Performed
2001-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-18 Well Log Performed
2001-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-19 Well Log Performed
2001-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-22 Well Log Performed
2001-10-23 Well Abandoned
2001-10-23 Well Fluid changed to Water
2001-10-23 Well Mode changed to Abandoned
2001-10-23 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-10-07 Bullet Perforation 1515.50 1522.50 0
2001-07-24 Remedial Casing Cementing 350.00 350.30 0
2001-07-25 Perforation 201.00 201.30 80
2001-07-26 Remedial Casing Cementing 201.00 201.30 0
2001-08-14 Perforation 264.00 264.30 80
2001-08-14 Perforation 220.00 220.30 80
2001-10-18 Packing Device Capped w/Cement 261.90 262.40 0
2001-10-19 Packing Device Capped w/Cement 217.90 218.40 0
2001-10-22 Packing Device Capped w/Cement 187.00 195.00 0
1957-10-07 Bullet Perforation 1529.50 1531.60 0
1957-10-08 Acid Treatment 1515.50 1531.60 0
1957-10-08 Fracture 1515.50 1531.60 0
1960-06-17 Acid Treatment 1515.50 1531.60 0
1967-06-23 Acid Treatment 1515.50 1531.60 0
2001-07-21 Packing Device Capped w/Cement 1497.00 1505.20 0
2001-07-22 Perforation 350.00 350.30 80
2001-07-23 Acid Treatment 350.00 350.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0

For data sources see[5]

References