X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475081314000

Well Details

Well ID: 0475081314000
Loading map...
Location: 00/14-13-047-08W5/0
Location Alias: 00/14-13-47-08 W5M
Location Alias 2: 00/14-13-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 13
County/Municipality: Clearwater County
Well Name: ENERPLUS ET AL B PEM 14-13-47-8
Operator Name: Bonterra Energy Corp.
License Number: 0010806
License Date: 1956-01-18
License Status: Issued
Spud Date: 1956-03-10
Final Drill Date: 1956-03-29
Well Total Depth: 1548.40 m
Surface Hole Latitude: 53.058255
Surface Hole Longitude: -115.044757

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-01-18 Obtained License
1956-03-29 Finished Drilling
1956-03-29 Well Mode changed to Drilled and Cased
1956-05-30 Production Casing Operation Performed
1956-06-09 Perforation Treatment Performed - Jet Perforation
1956-06-10 Perforation Treatment Performed - Fractured
1956-06-18 Well Began Production
1956-06-18 Well Fluid changed to Crude Oil
1956-06-18 Well Mode changed to Flowing
1956-11-01 Well Began Injection
1956-11-01 Well Fluid changed to Water
1956-11-01 Well Type changed to Injection
1958-07-07 Perforation Treatment Performed - Cement Plug
1958-07-07 Perforation Treatment Performed - Fractured
1990-11-29 Well Log Performed
1993-01-29 Perforation Treatment Performed - Jet Perforation
1993-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-03 Perforation Treatment Performed - Cement Squeeze
1993-02-06 Perforation Treatment Performed - Jet Perforation
1993-02-07 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-06-09 Perforation 1512.70 1514.60 13
1993-02-07 Cement Squeeze 300.00 300.50 0
1956-06-09 Perforation 1505.10 1510.60 13
1956-06-10 Fracture 1505.10 1514.60 0
1958-07-07 Cement Plug 1510.90 1511.50 0
1958-07-07 Fracture 1505.10 1511.50 0
1993-01-29 Perforation 335.00 335.50 13
1993-02-02 Acid Treatment 335.00 335.50 0
1993-02-03 Cement Squeeze 335.00 335.50 0
1993-02-06 Perforation 300.00 300.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References