X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475081308000

Well Details

Well ID: 0475081308000
Loading map...
Location: 00/08-13-047-08W5/0
Location Alias: 00/08-13-47-08 W5M
Location Alias 2: 00/08-13-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 13
County/Municipality: Clearwater County
Well Name: ENERPLUS ET AL B PEM IN 8-13-47-8
Operator Name: Bonterra Energy Corp.
License Number: 0010403
License Date: 1955-10-31
License Status: Issued
Spud Date: 1955-12-10
Final Drill Date: 1955-12-22
Well Total Depth: 1573.70 m
Surface Hole Latitude: 53.052441
Surface Hole Longitude: -115.028438

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-10-31 Obtained License
1955-12-22 Finished Drilling
1955-12-22 Well Mode changed to Drilled and Cased
1955-12-23 Production Casing Operation Performed
1956-01-04 Perforation Treatment Performed - Jet Perforation
1956-01-05 Perforation Treatment Performed - Acid Wash - No Pressure
1956-01-05 Perforation Treatment Performed - Fractured
1956-01-09 Well Began Production
1956-01-09 Well Fluid changed to Crude Oil
1956-01-09 Well Mode changed to Flowing
1956-11-01 Well Began Injection
1956-11-01 Well Fluid changed to Water
1956-11-01 Well Type changed to Injection
1972-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-01 Well Fluid changed to Water
1989-11-01 Well Mode changed to Suspended
1989-11-01 Well Type changed to Injection
1990-03-01 Well Fluid changed to Water
1990-03-01 Well Type changed to Injection
2005-09-10 Perforation Treatment Performed - Jet Perforation
2005-09-13 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-01-04 Perforation 1536.80 1537.70 13
1956-01-05 Acid Wash 1536.80 1537.70 0
1956-01-05 Fracture 1536.80 1537.70 0
1972-02-03 Acid Treatment 1536.80 1537.70 0
2005-09-10 Perforation 1532.50 1541.50 20
2005-09-13 Fracture 1532.50 1541.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References