X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475080913000

Well Details

Well ID: 0475080913000
Loading map...
Location: 00/13-09-047-08W5/0
Location Alias: 00/13-09-47-08 W5M
Location Alias 2: 00/13-09-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 09
County/Municipality: Clearwater County
Well Name: ARC HZ PEMBINA 13-9-47-8
Operator Name: ARC Resources Ltd.
License Number: 0427041
License Date: 2010-12-06
License Status: Issued
Spud Date: 2010-12-13
Final Drill Date: 2011-01-09
Well Total Depth: 3111.00 m
Surface Hole Latitude: 53.042348
Surface Hole Longitude: -115.135464

For data sources see[1][2]

Well History

Date Event
2010-12-06 Obtained License
2010-12-14 Surface Casing Operation Performed
2010-12-15 Direction Drilling Operation Performed - Horizontal
2010-12-15 Well Log Performed
2010-12-19 Intermediate Casing Operation Performed
2011-01-09 Finished Drilling
2011-01-09 Well Mode changed to Drilled and Cased
2011-01-11 Liner Casing Operation Performed
2011-01-12 Rig Released
2011-01-16 Well Log Performed
2011-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-20 Perforation Treatment Performed - Open-Hole Completion
2011-02-27 Well Began Production
2011-02-27 Well Fluid changed to Crude Oil
2011-02-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-15 1235.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-20 Multi-Stage Fracture 1994.00 2076.40 0
2011-01-20 Open Hole/Barefoot Completion 1994.00 3091.10 0
2011-01-20 Multi-Stage Fracture 2081.50 2267.80 0
2011-01-20 Multi-Stage Fracture 2272.90 2377.00 0
2011-01-20 Multi-Stage Fracture 2382.20 2534.10 0
2011-01-20 Multi-Stage Fracture 2539.20 2666.90 0
2011-01-20 Multi-Stage Fracture 2672.00 2813.10 0
2011-01-20 Multi-Stage Fracture 2818.20 2946.30 0
2011-01-20 Multi-Stage Fracture 2951.40 3079.60 0
2011-01-20 Multi-Stage Fracture 3084.70 3091.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7275 0.0 0.0 0.0
2012 7089 0.0 0.0 0.0
2013 4806 0.0 0.0 0.0
2014 7863 0.0 0.0 0.0
2015 8666 0.0 0.0 0.0
2016 8448 0.0 0.0 0.0
2017 8609 0.0 0.0 0.0
2018 8375 0.0 0.0 0.0
2019 7907 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[6]

References