X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475080904000

Well Details

Well ID: 0475080904000
Loading map...
Location: 00/04-09-047-08W5/0
Location Alias: 00/04-09-47-08 W5M
Location Alias 2: 00/04-09-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 09
County/Municipality: Clearwater County
Well Name: PAN AM HB ROSECK C-26 PEM 4-9-47-8
Operator Name: ARC Resources Ltd.
License Number: 0027043
License Date: 1964-10-26
License Status: Suspension
Spud Date: 1964-11-02
Final Drill Date: 1964-11-11
Well Total Depth: 1636.80 m
Surface Hole Latitude: 53.034166
Surface Hole Longitude: -115.120069

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-10-26 Obtained License
1964-11-11 Finished Drilling
1964-11-11 Well Mode changed to Drilled and Cased
1964-11-12 Production Casing Operation Performed
1965-01-03 Well Began Production
1965-01-03 Well Fluid changed to Crude Oil
1965-01-03 Well Mode changed to Pumping
1965-11-19 Perforation Treatment Performed - Jet Perforation
1965-11-23 Perforation Treatment Performed - Fractured
1968-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-02 Perforation Treatment Performed - Fractured
1968-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-01 Well Began Injection
1981-04-01 Well Fluid changed to Water
1981-04-01 Well Type changed to Injection
1994-03-24 Well Log Performed
1994-03-25 Perforation Treatment Performed - Jet Perforation
1994-03-26 Perforation Treatment Performed - Cement Squeeze
2009-12-03 Well Fluid changed to Water
2009-12-03 Well Mode changed to Suspended
2009-12-03 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-19 Perforation 1607.20 1609.30 13
1965-11-19 Perforation 1611.20 1614.20 13
1965-11-23 Fracture 1607.20 1614.20 0
1968-08-02 Acid Treatment 1607.20 1614.20 0
1968-08-02 Fracture 1607.20 1614.20 0
1968-08-03 Acid Treatment 1607.20 1614.20 0
1994-03-25 Perforation 1265.70 1266.00 4
1994-03-26 Cement Squeeze 1265.70 1266.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8091 0.0 0.0 0.0
1968 7895 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 7977 0.0 0.0 0.0
1971 8327 0.0 0.0 0.0
1972 8002 0.0 0.0 0.0
1973 8423 0.0 0.0 0.0
1974 8255 0.0 0.0 0.0
1975 8520 0.0 0.0 0.0
1976 8591 0.0 0.0 0.0
1977 8735 0.0 0.0 0.0
1978 8664 0.0 0.0 0.0
1979 8759 0.0 0.0 0.0
1980 8687 0.0 0.0 0.0
1981 1176 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References