If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475080511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.041441,"lon":-115.148455,"icon":""}]} |
Location: 00/11-05-047-08W5/0 | |
Location Alias: 00/11-05-47-08 W5M | |
Location Alias 2: 00/11-05-047-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 08 | |
Section: 05 | |
County/Municipality: Clearwater County | |
Well Name: BONTERRA HZ PEMBINA 11-5-47-8 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0445525 | |
License Date: 2012-04-27 | |
License Status: Issued | |
Spud Date: 2012-08-09 | |
Final Drill Date: 2012-08-23 | |
Well Total Depth: 3333.00 m | |
Surface Hole Latitude: 53.041441 | |
Surface Hole Longitude: -115.148455 |
Date | Event |
---|---|
2012-04-27 | Obtained License |
2012-08-11 | Surface Casing Operation Performed |
2012-08-14 | Direction Drilling Operation Performed - Deviate |
2012-08-16 | Direction Drilling Operation Performed - Horizontal |
2012-08-17 | Intermediate Casing Operation Performed |
2012-08-18 | Well Log Performed |
2012-08-23 | Finished Drilling |
2012-08-23 | Well Mode changed to Drilled and Cased |
2012-08-26 | Liner Casing Operation Performed |
2012-08-26 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-27 | Rig Released |
2012-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-23 | Well Began Production |
2012-09-23 | Well Fluid changed to Crude Oil |
2012-09-23 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-09 | Precision Drilling Corporation | 422 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-14 | 1285.50 | Deviate (5 - 79 degrees) |
2012-08-16 | 1779.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-26 | Open Hole/Barefoot Completion | 3297.00 | 3333.00 | 0 |
2012-09-21 | Multi-Stage Fracture | 2579.00 | 2579.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 2498.00 | 2498.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 2418.00 | 2418.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 2332.10 | 2332.20 | 0 |
2012-09-21 | Multi-Stage Fracture | 2248.00 | 2248.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 2163.90 | 2164.00 | 0 |
2012-09-21 | Multi-Stage Fracture | 2079.70 | 2079.80 | 0 |
2012-09-21 | Multi-Stage Fracture | 1995.00 | 1995.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 1907.70 | 1907.80 | 0 |
2012-09-21 | Multi-Stage Fracture | 3292.10 | 3292.20 | 0 |
2012-09-21 | Multi-Stage Fracture | 3182.00 | 3182.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 3085.00 | 3085.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 2966.00 | 2966.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 2914.00 | 2914.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 2828.60 | 2828.70 | 0 |
2012-09-21 | Multi-Stage Fracture | 2742.70 | 2742.80 | 0 |
2012-09-21 | Multi-Stage Fracture | 2661.30 | 2661.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2096 | 0.0 | 0.0 | 0.0 |
2013 | 8664 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8658 | 0.0 | 0.0 | 0.0 |
2016 | 8749 | 0.0 | 0.0 | 0.0 |
2017 | 8480 | 0.0 | 0.0 | 0.0 |
2018 | 8757 | 0.0 | 0.0 | 0.0 |
2019 | 8663 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-27 | No Incident Encountered | 0.00 | 0.00 |
2012-09-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]