X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475080310000

Well Details

Well ID: 0475080310000
Loading map...
Location: 00/10-03-047-08W5/0
Location Alias: 00/10-03-47-08 W5M
Location Alias 2: 00/10-03-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 03
County/Municipality: Clearwater County
Well Name: DEV-PAL PEMBINA 10-3-47-8
Operator Name: Obsidian Energy Ltd.
License Number: 0017861
License Date: 1959-09-30
License Status: Abandoned
Spud Date: 1959-10-14
Final Drill Date: 1959-10-22
Well Total Depth: 1615.40 m
Surface Hole Latitude: 53.027341
Surface Hole Longitude: -115.082884

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-09-30 Obtained License
1959-10-22 Finished Drilling
1959-10-22 Well Mode changed to Drilled and Cased
1959-10-24 Perforation Treatment Performed - Permeator Perforation
1959-10-24 Production Casing Operation Performed
1959-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-10-29 Perforation Treatment Performed - Fractured
1959-11-14 Well Began Production
1959-11-14 Well Fluid changed to Crude Oil
1959-11-14 Well Mode changed to Pumping
1962-05-11 Perforation Treatment Performed - Jet Perforation
1962-05-12 Perforation Treatment Performed - Acid Wash - No Pressure
1962-05-12 Perforation Treatment Performed - Fractured
1994-10-27 Well Log Performed
1994-12-02 Well Began Injection
1994-12-02 Well Fluid changed to Water
1994-12-02 Well Type changed to Injection
1999-08-01 Well Fluid changed to Water
1999-08-01 Well Mode changed to Suspended
1999-08-01 Well Type changed to Injection
2004-10-05 Well Fluid changed to Water
2004-10-05 Well Type changed to Injection
2007-07-22 Well Log Performed
2007-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-23 Perforation Treatment Performed - Jet Perforation
2007-07-23 Plug Back Performed
2007-07-23 Well Fluid changed to Water
2007-07-23 Well Log Performed
2007-07-23 Well Mode changed to Abandoned Zone
2007-07-23 Well Type changed to Injection
2007-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-24 Perforation Treatment Performed - Remedial Casing
2007-07-25 Perforation Treatment Performed - Jet Perforation
2007-07-25 Well Log Performed
2007-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-26 Perforation Treatment Performed - Remedial Casing
2007-07-28 Perforation Treatment Performed - Jet Perforation
2007-07-28 Well Log Performed
2007-07-30 Perforation Treatment Performed - Remedial Casing
2007-07-30 Well Log Performed
2007-08-02 Perforation Treatment Performed - Jet Perforation
2007-08-02 Well Log Performed
2007-08-03 Perforation Treatment Performed - Jet Perforation
2007-08-07 Well Log Performed
2007-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-08 Perforation Treatment Performed - Remedial Casing
2007-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-10 Perforation Treatment Performed - Jet Perforation
2007-08-10 Perforation Treatment Performed - Remedial Casing
2007-08-11 Well Abandoned
2007-08-11 Well Fluid changed to Water
2007-08-11 Well Mode changed to Abandoned
2007-08-11 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-10-24 Permeator Perforation 1592.90 1593.50 0
2007-07-23 Perforation 1310.00 1310.50 17
2007-07-24 Remedial Casing Cementing 1310.00 1310.50 0
2007-07-24 Packing Device Capped w/Cement 1297.00 1305.00 0
2007-07-25 Perforation 1030.00 1030.50 17
2007-07-26 Remedial Casing Cementing 1030.00 1030.50 0
2007-07-26 Packing Device Capped w/Cement 1020.50 1028.50 0
2007-07-28 Perforation 375.00 375.50 17
2007-07-30 Remedial Casing Cementing 375.00 375.50 0
2007-08-02 Perforation 545.00 545.50 17
2007-08-02 Perforation 427.00 427.50 17
1959-10-24 Permeator Perforation 1596.50 1597.20 0
2007-08-03 Perforation 501.00 501.50 17
2007-08-08 Remedial Casing Cementing 501.00 545.50 0
2007-08-08 Packing Device Capped w/Cement 468.00 540.00 0
2007-08-10 Packing Device Capped w/Cement 408.00 418.00 0
2007-08-10 Perforation 239.50 240.00 17
2007-08-10 Remedial Casing Cementing 239.50 240.00 0
2007-08-10 Packing Device Capped w/Cement 208.60 233.00 0
1959-10-24 Permeator Perforation 1597.80 1598.40 0
1959-10-29 Acid Treatment 1592.90 1598.40 0
1959-10-29 Fracture 1592.90 1598.40 0
1962-05-11 Perforation 1598.70 1599.00 10
1962-05-12 Acid Wash 1592.90 1599.00 0
1962-05-12 Fracture 1592.90 1599.00 0
2007-07-23 Packing Device Capped w/Cement 1574.50 1582.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8543 0.0 0.0 0.0
1968 8485 0.0 0.0 0.0
1969 8712 0.0 0.0 0.0
1970 8615 0.0 0.0 0.0
1971 8668 0.0 0.0 0.0
1972 8675 0.0 0.0 0.0
1973 8591 0.0 0.0 0.0
1974 8502 0.0 0.0 0.0
1975 8538 0.0 0.0 0.0
1976 8575 0.0 0.0 0.0
1977 8635 0.0 0.0 0.0
1978 8747 0.0 0.0 0.0
1979 6640 0.0 0.0 0.0
1980 8567 0.0 0.0 0.0
1981 8472 0.0 0.0 0.0
1982 7885 0.0 0.0 0.0
1983 7824 0.0 0.0 0.0
1984 8469 0.0 0.0 0.0
1985 8559 0.0 0.0 0.0
1986 8379 0.0 0.0 0.0
1987 8177 0.0 0.0 0.0
1988 8255 0.0 0.0 0.0
1989 8015 0.0 0.0 0.0
1990 7617 0.0 0.0 0.0
1991 7227 0.0 0.0 0.0
1992 8207 0.0 0.0 0.0
1993 8472 0.0 0.0 0.0
1994 6725 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[5]

References