X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475070902000

Well Details

Well ID: 0475070902000
Loading map...
Location: 00/02-09-047-07W5/0
Location Alias: 00/02-09-47-07 W5M
Location Alias 2: 00/02-09-047-07 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 07
Section: 09
County/Municipality: County of Wetaskiwin No. 10
Well Name: NORCEN ET AL A PEM 2-9-47-7
Operator Name: Bonterra Energy Corp.
License Number: 0008975
License Date: 1955-01-06
License Status: Issued
Spud Date: 1955-02-06
Final Drill Date: 1955-02-23
Well Total Depth: 1595.00 m
Surface Hole Latitude: 53.034216
Surface Hole Longitude: -114.961738

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-01-06 Obtained License
1955-02-23 Finished Drilling
1955-02-23 Well Mode changed to Drilled and Cased
1955-02-25 Production Casing Operation Performed
1955-02-28 Perforation Treatment Performed - Jet Perforation
1955-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-03-04 Perforation Treatment Performed - Fractured
1955-03-08 Well Began Production
1955-03-08 Well Fluid changed to Crude Oil
1955-03-08 Well Mode changed to Flowing
1956-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-07-11 Perforation Treatment Performed - Fractured
1956-07-11 Perforation Treatment Performed - Jet Perforation
1961-05-27 Well Fluid changed to Crude Oil
1961-05-27 Well Mode changed to Pumping
1992-09-09 Perforation Treatment Performed - Jet Perforation
1992-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-11 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-02-28 Perforation 1560.60 1564.20 13
1992-09-11 Fracture 1549.00 1568.80 0
1955-02-28 Perforation 1567.00 1568.80 13
1955-03-04 Acid Treatment 1560.60 1568.80 0
1955-03-04 Fracture 1560.60 1568.80 0
1956-07-11 Perforation 1551.10 1558.10 13
1956-07-11 Acid Treatment 1551.10 1558.10 0
1956-07-11 Fracture 1551.10 1558.10 0
1992-09-09 Perforation 1549.00 1557.50 13
1992-09-10 Acid Treatment 1549.00 1568.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1650 0.0 0.0 0.0
1968 3314 0.0 0.0 0.0
1969 7029 0.0 0.0 0.0
1970 8140 0.0 0.0 0.0
1971 8701 0.0 0.0 0.0
1972 8716 0.0 0.0 0.0
1973 8654 0.0 0.0 0.0
1974 8593 0.0 0.0 0.0
1975 8253 0.0 0.0 0.0
1976 8547 0.0 0.0 0.0
1977 8455 0.0 0.0 0.0
1978 7476 0.0 0.0 0.0
1979 8615 0.0 0.0 0.0
1980 8159 0.0 0.0 0.0
1981 8543 0.0 0.0 0.0
1982 8711 0.0 0.0 0.0
1983 8663 0.0 0.0 0.0
1984 7031 0.0 0.0 0.0
1985 8351 0.0 0.0 0.0
1986 8735 0.0 0.0 0.0
1987 7967 0.0 0.0 0.0
1988 8044 0.0 0.0 0.0
1989 8207 0.0 0.0 0.0
1990 8352 0.0 0.0 0.0
1991 8520 0.0 0.0 0.0
1992 8039 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8513 0.0 0.0 0.0
1995 8706 0.0 0.0 0.0
1996 8709 0.0 0.0 0.0
1997 8719 0.0 0.0 0.0
1998 8484 0.0 0.0 0.0
1999 8731 0.0 0.0 0.0
2000 7835 0.0 0.0 0.0
2001 8323 0.0 0.0 0.0
2002 8337 0.0 0.0 0.0
2003 8374 0.0 0.0 0.0
2004 8627 0.0 0.0 0.0
2005 8584 0.0 0.0 0.0
2006 8615 0.0 0.0 0.0
2007 8175 0.0 0.0 0.0
2008 8696 0.0 0.0 0.0
2009 8120 0.0 0.0 0.0
2010 8396 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 7751 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8232 0.0 0.0 0.0
2016 8263 0.0 0.0 0.0
2017 8203 0.0 0.0 0.0
2018 8327 0.0 0.0 0.0
2019 8255 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

References