X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475070502000

Well Details

Well ID: 0475070502000
Loading map...
Location: 00/02-05-047-07W5/0
Location Alias: 00/02-05-47-07 W5M
Location Alias 2: 00/02-05-047-07 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 07
Section: 05
County/Municipality: County of Wetaskiwin No. 10
Well Name: BONTERRA PEMBINA 2-5-47-7
Operator Name: Bonterra Energy Corp.
License Number: 0011180
License Date: 1956-03-09
License Status: Issued
Spud Date: 1956-03-20
Final Drill Date: 1956-05-03
Well Total Depth: 1626.10 m
Surface Hole Latitude: 53.020080
Surface Hole Longitude: -114.986005

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-03-09 Obtained License
1956-05-03 Finished Drilling
1956-05-03 Well Mode changed to Drilled and Cased
1956-05-04 Production Casing Operation Performed
1956-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-05-07 Perforation Treatment Performed - Jet Perforation
1956-05-10 Well Began Production
1956-05-10 Well Fluid changed to Crude Oil
1956-05-10 Well Mode changed to Flowing
1956-05-20 Well Fluid changed to Crude Oil
1956-05-20 Well Mode changed to Pumping
1958-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-08 Perforation Treatment Performed - Bullet Perforation
1958-05-08 Perforation Treatment Performed - Cement Plug
1958-05-08 Perforation Treatment Performed - Fractured
1958-05-08 Perforation Treatment Performed - Jet Perforation
1983-08-24 Perforation Treatment Performed - Jet Perforation
1983-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-05-07 Perforation 1589.20 1595.60 13
1983-08-25 Acid Treatment 1575.50 1584.40 0
1956-05-07 Acid Treatment 1589.20 1595.60 0
1958-05-08 Bullet Perforation 1575.50 1582.80 13
1958-05-08 Perforation 1575.50 1582.80 13
1958-05-08 Cement Plug 1589.20 1595.60 0
1958-05-08 Acid Treatment 1575.50 1582.80 0
1958-05-08 Fracture 1575.50 1582.80 0
1983-08-24 Perforation 1577.60 1578.90 7
1983-08-24 Perforation 1581.00 1584.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3000 0.0 0.0 0.0
1968 3744 0.0 0.0 0.0
1969 6194 0.0 0.0 0.0
1970 6636 0.0 0.0 0.0
1971 8182 0.0 0.0 0.0
1972 8367 0.0 0.0 0.0
1973 8759 0.0 0.0 0.0
1974 8551 0.0 0.0 0.0
1975 8399 0.0 0.0 0.0
1976 7896 0.0 0.0 0.0
1977 8759 0.0 0.0 0.0
1978 8536 0.0 0.0 0.0
1979 8423 0.0 0.0 0.0
1980 8183 0.0 0.0 0.0
1981 8075 0.0 0.0 0.0
1982 8232 0.0 0.0 0.0
1983 7079 0.0 0.0 0.0
1984 8447 0.0 0.0 0.0
1985 8579 0.0 0.0 0.0
1986 8459 0.0 0.0 0.0
1987 8663 0.0 0.0 0.0
1988 8448 0.0 0.0 0.0
1989 8591 0.0 0.0 0.0
1990 8448 0.0 0.0 0.0
1991 8088 0.0 0.0 0.0
1992 8759 0.0 0.0 0.0
1993 8519 0.0 0.0 0.0
1994 8477 0.0 0.0 0.0
1995 8092 0.0 0.0 0.0
1996 7920 0.0 0.0 0.0
1997 7820 0.0 0.0 0.0
1998 7605 0.0 0.0 0.0
1999 7907 0.0 0.0 0.0
2000 8088 0.0 0.0 0.0
2001 7943 0.0 0.0 0.0
2002 8136 0.0 0.0 0.0
2003 7595 0.0 0.0 0.0
2004 6912 0.0 0.0 0.0
2005 8279 0.0 0.0 0.0
2006 7055 0.0 0.0 0.0
2007 8135 0.0 0.0 0.0
2008 8112 0.0 0.0 0.0
2009 8044 0.0 0.0 0.0
2010 8256 0.0 0.0 0.0
2011 7871 0.0 0.0 0.0
2012 7968 0.0 0.0 0.0
2013 8183 0.0 0.0 0.0
2014 8208 0.0 0.0 0.0
2015 5832 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8483 0.0 0.0 0.0
2018 8748 0.0 0.0 0.0
2019 8738 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References