X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475070308020

Well Details

Well ID: 0475070308020
Loading map...
Location: 02/08-03-047-07W5/0
Location Alias: 02/08-03-47-07 W5M
Location Alias 2: 02/08-03-047-07 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 07
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: BONTERRA 102 HZ PEMBINA 8-3-47-7
Operator Name: Bonterra Energy Corp.
License Number: 0490307
License Date: 2018-08-03
License Status: Amended
Spud Date: 2018-08-24
Final Drill Date: 2018-08-30
Well Total Depth: 3183.00 m
Surface Hole Latitude: 53.023298
Surface Hole Longitude: -114.955693

For data sources see[1][2]

Well History

Date Event
2018-08-03 Obtained License
2018-08-24 Surface Casing Operation Performed
2018-08-26 Direction Drilling Operation Performed - Deviate
2018-08-27 Direction Drilling Operation Performed - Horizontal
2018-08-30 Finished Drilling
2018-08-30 Well Log Performed
2018-08-30 Well Mode changed to Drilled and Cased
2018-08-31 Production Casing Operation Performed
2018-09-01 Rig Released
2018-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-15 Well Began Production
2018-10-15 Well Fluid changed to Crude Oil
2018-10-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-23 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-26 1239.50 Deviate (5 - 79 degrees)
2018-08-27 1732.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-08 Multi-Stage Fracture 3142.80 3144.80 0
2018-10-08 Multi-Stage Fracture 2713.10 2715.00 0
2018-10-08 Multi-Stage Fracture 2664.50 2666.40 0
2018-10-08 Multi-Stage Fracture 2616.90 2618.80 0
2018-10-08 Multi-Stage Fracture 2568.80 2570.70 0
2018-10-08 Multi-Stage Fracture 2521.40 2523.30 0
2018-10-08 Multi-Stage Fracture 2473.90 2475.80 0
2018-10-08 Multi-Stage Fracture 2426.10 2428.00 0
2018-10-08 Multi-Stage Fracture 2378.30 2380.20 0
2018-10-08 Multi-Stage Fracture 2330.30 2332.30 0
2018-10-08 Multi-Stage Fracture 2282.10 2284.10 0
2018-10-08 Multi-Stage Fracture 3095.20 3097.10 0
2018-10-08 Multi-Stage Fracture 2234.50 2236.40 0
2018-10-08 Multi-Stage Fracture 2186.90 2188.80 0
2018-10-08 Multi-Stage Fracture 2137.80 2139.70 0
2018-10-08 Multi-Stage Fracture 2090.60 2092.50 0
2018-10-08 Multi-Stage Fracture 2042.90 2044.90 0
2018-10-08 Multi-Stage Fracture 1995.00 1996.90 0
2018-10-08 Multi-Stage Fracture 1946.70 1948.60 0
2018-10-08 Multi-Stage Fracture 1898.70 1900.60 0
2018-10-08 Multi-Stage Fracture 1851.00 1852.90 0
2018-10-08 Multi-Stage Fracture 1803.10 1805.00 0
2018-10-08 Multi-Stage Fracture 3047.60 3049.60 0
2018-10-08 Multi-Stage Fracture 1766.10 1768.00 0
2018-10-08 Multi-Stage Fracture 3000.00 3001.90 0
2018-10-08 Multi-Stage Fracture 2951.60 2953.50 0
2018-10-08 Multi-Stage Fracture 2903.80 2905.70 0
2018-10-08 Multi-Stage Fracture 2856.30 2858.20 0
2018-10-08 Multi-Stage Fracture 2808.50 2810.40 0
2018-10-08 Multi-Stage Fracture 2760.90 2762.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-08 2018-10-08 1,564 3,403 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.0852 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 11.1037 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 3.9545 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0285 N/A
dibromoacetonitrile 3252-43-5 100 0.0285 N/A
non-hazardous ingredients Not Available 100 0.0285 N/A
polyethylene glycol 25322-68-3 100 0.0285 N/A
sodium bromide 7647-15-6 100 0.0285 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0948 N/A
water Not Available 100 0.0948 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0594 N/A
non-hazardous ingredients Not Available 100 0.0594 N/A
NMR-1 Trican Surfactant methanol 67-56-1 100 0.0438 N/A
non-hazardous ingredients Not Available 100 0.0438 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-06 2018-10-08 Surface Water - Runoff 3071
2018-10-05 2018-10-12 Surface Water - Runoff 433

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1848 0.0 0.0 0.0
2019 8231 0.0 0.0 0.0
2020 1973 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-01 No Incident Encountered 0.00 0.00
2018-10-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References