If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475070210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.026946,"lon":-114.912875,"icon":""}]} |
Location: 00/10-02-047-07W5/0 | |
Location Alias: 00/10-02-47-07 W5M | |
Location Alias 2: 00/10-02-047-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 07 | |
Section: 02 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: ENERPLUS ET AL A PEM 10-2-47-7 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0009211 | |
License Date: 1955-02-22 | |
License Status: Suspension | |
Spud Date: 1955-03-10 | |
Final Drill Date: 1955-12-04 | |
Well Total Depth: 1610.60 m | |
Surface Hole Latitude: 53.026946 | |
Surface Hole Longitude: -114.912875 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1955-02-22 | Obtained License |
1955-12-04 | Finished Drilling |
1955-12-04 | Well Mode changed to Drilled and Cased |
1955-12-05 | Production Casing Operation Performed |
1955-12-07 | Perforation Treatment Performed - Bullet Perforation |
1955-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-12-12 | Perforation Treatment Performed - Fractured |
1955-12-18 | Well Began Production |
1955-12-18 | Well Fluid changed to Crude Oil |
1955-12-18 | Well Mode changed to Flowing |
1956-07-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-07-17 | Perforation Treatment Performed - Fractured |
1956-07-17 | Perforation Treatment Performed - Jet Perforation |
1959-04-13 | Well Fluid changed to Crude Oil |
1959-04-13 | Well Mode changed to Pumping |
1962-05-12 | Perforation Treatment Performed - Cement Squeeze |
1962-05-12 | Perforation Treatment Performed - Jet Perforation |
1962-05-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-05-15 | Perforation Treatment Performed - Jet Perforation |
1962-05-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-06-07 | Perforation Treatment Performed - Cement Squeeze |
1962-06-23 | Perforation Treatment Performed - Fractured |
1971-10-01 | Well Fluid changed to Crude Oil |
1971-10-01 | Well Mode changed to Suspended |
1988-03-07 | Well Fluid changed to Crude Oil |
1988-03-07 | Well Mode changed to Flowing |
1988-03-27 | Well Fluid changed to Crude Oil |
1988-03-27 | Well Mode changed to Suspended |
1995-07-01 | Well Fluid changed to Crude Oil |
1995-07-01 | Well Mode changed to Flowing |
1995-09-30 | Well Fluid changed to Crude Oil |
1995-09-30 | Well Mode changed to Suspended |
2009-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-03 | Plug Back Performed |
2009-03-03 | Well Fluid changed to Crude Oil |
2009-03-03 | Well Log Performed |
2009-03-03 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-12-07 | Bullet Perforation | 1576.10 | 1581.60 | 13 |
1962-05-14 | Acid Treatment | 1570.20 | 1570.50 | 0 |
1962-05-15 | Perforation | 1577.60 | 1578.20 | 13 |
1962-05-23 | Acid Treatment | 1570.20 | 1570.50 | 0 |
1962-06-07 | Cement Squeeze | 1570.20 | 1570.50 | 0 |
1962-06-23 | Fracture | 1577.60 | 1585.30 | 0 |
2009-03-03 | Packing Device Capped w/Cement | 1557.00 | 1565.00 | 0 |
1955-12-07 | Bullet Perforation | 1583.70 | 1585.30 | 13 |
1955-12-12 | Acid Treatment | 1576.10 | 1585.30 | 0 |
1955-12-12 | Fracture | 1576.10 | 1585.30 | 0 |
1956-07-17 | Perforation | 1571.50 | 1574.90 | 13 |
1956-07-17 | Acid Treatment | 1571.50 | 1581.60 | 0 |
1956-07-17 | Fracture | 1571.50 | 1581.60 | 0 |
1962-05-12 | Cement Squeeze | 1571.50 | 1581.60 | 0 |
1962-05-12 | Perforation | 1570.20 | 1570.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 504 | 0.0 | 0.0 | 0.0 |
1995 | 1726 | 0.0 | 0.0 | 0.0 |
For data sources see[5]