X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475070202000

Well Details

Well ID: 0475070202000
Loading map...
Location: 00/02-02-047-07W5/0
Location Alias: 00/02-02-47-07 W5M
Location Alias 2: 00/02-02-047-07 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 07
Section: 02
County/Municipality: County of Wetaskiwin No. 10
Well Name: BONTERRA PEMBINA 2-2-47-7
Operator Name: Bonterra Energy Corp.
License Number: 0011012
License Date: 1956-02-21
License Status: Issued
Spud Date: 1956-05-19
Final Drill Date: 1956-06-05
Well Total Depth: 1603.90 m
Surface Hole Latitude: 53.020473
Surface Hole Longitude: -114.913408

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-02-21 Obtained License
1956-06-05 Drill Stem Test Performed
1956-06-05 Finished Drilling
1956-06-05 Well Mode changed to Drilled and Cased
1956-06-06 Production Casing Operation Performed
1956-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-06-22 Perforation Treatment Performed - Jet Perforation
1956-06-23 Perforation Treatment Performed - Fractured
1956-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-06-25 Perforation Treatment Performed - Fractured
1956-06-25 Perforation Treatment Performed - Jet Perforation
1956-06-30 Well Began Production
1956-06-30 Well Fluid changed to Crude Oil
1956-06-30 Well Mode changed to Pumping
1975-06-18 Well Fluid changed to Crude Oil
1975-06-18 Well Mode changed to Flowing
1976-10-09 Well Fluid changed to Crude Oil
1976-10-09 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-06-22 Perforation 1575.50 1576.10 13
1956-06-22 Perforation 1577.30 1578.90 13
1956-06-22 Acid Treatment 1575.50 1578.90 0
1956-06-23 Fracture 1575.50 1578.90 0
1956-06-25 Perforation 1570.90 1574.30 13
1956-06-25 Acid Treatment 1570.90 1574.30 0
1956-06-25 Fracture 1570.90 1574.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 864 0.0 0.0 0.0
1968 4138 0.0 0.0 0.0
1969 7824 0.0 0.0 0.0
1970 8392 0.0 0.0 0.0
1971 8726 0.0 0.0 0.0
1972 8706 0.0 0.0 0.0
1973 8669 0.0 0.0 0.0
1974 8759 0.0 0.0 0.0
1975 8720 0.0 0.0 0.0
1976 8675 0.0 0.0 0.0
1977 8579 0.0 0.0 0.0
1978 8712 0.0 0.0 0.0
1979 8223 0.0 0.0 0.0
1980 8735 0.0 0.0 0.0
1981 8590 0.0 0.0 0.0
1982 8747 0.0 0.0 0.0
1983 8725 0.0 0.0 0.0
1984 8507 0.0 0.0 0.0
1985 8659 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8739 0.0 0.0 0.0
1988 8495 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8471 0.0 0.0 0.0
1991 8360 0.0 0.0 0.0
1992 7891 0.0 0.0 0.0
1993 8299 0.0 0.0 0.0
1994 8555 0.0 0.0 0.0
1995 8662 0.0 0.0 0.0
1996 7927 0.0 0.0 0.0
1997 8336 0.0 0.0 0.0
1998 7528 0.0 0.0 0.0
1999 8447 0.0 0.0 0.0
2000 8591 0.0 0.0 0.0
2001 8419 0.0 0.0 0.0
2002 8303 0.0 0.0 0.0
2003 8160 0.0 0.0 0.0
2004 8376 0.0 0.0 0.0
2005 8303 0.0 0.0 0.0
2006 8421 0.0 0.0 0.0
2007 8519 0.0 0.0 0.0
2008 8339 0.0 0.0 0.0
2009 8615 0.0 0.0 0.0
2010 8232 0.0 0.0 0.0
2011 8543 0.0 0.0 0.0
2012 8447 0.0 0.0 0.0
2013 8104 0.0 0.0 0.0
2014 7872 0.0 0.0 0.0
2016 5107 0.0 0.0 0.0
2017 8490 0.0 0.0 0.0
2018 8567 0.0 0.0 0.0
2019 8252 0.0 0.0 0.0
2020 1811 0.0 0.0 0.0

For data sources see[5]

References