X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475063604020

Well Details

Well ID: 0475063604020
Loading map...
Location: 02/04-36-047-06W5/0
Location Alias: 02/04-36-47-06 W5M
Location Alias 2: 02/04-36-047-06 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 06
Section: 36
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 4-36-47-6
Operator Name: Bonterra Energy Corp.
License Number: 0464162
License Date: 2014-01-20
License Status: Issued
Spud Date: 2014-02-10
Final Drill Date: 2014-02-19
Well Total Depth: 4004.00 m
Surface Hole Latitude: 53.115111
Surface Hole Longitude: -114.756273

For data sources see[1][2]

Well History

Date Event
2014-01-20 Obtained License
2014-02-11 Surface Casing Operation Performed
2014-02-12 Direction Drilling Operation Performed - Deviate
2014-02-13 Direction Drilling Operation Performed - Horizontal
2014-02-19 Finished Drilling
2014-02-19 Well Mode changed to Drilled and Cased
2014-02-21 Production Casing Operation Performed
2014-02-21 Rig Released
2014-02-22 Well Log Performed
2014-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-14 Well Began Production
2014-03-14 Well Fluid changed to Crude Oil
2014-03-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-02-10 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-12 690.10 Deviate (5 - 79 degrees)
2014-02-13 1594.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-07 Multi-Stage Fracture 3978.40 3978.50 0
2014-03-10 Multi-Stage Fracture 2879.20 2879.30 0
2014-03-10 Multi-Stage Fracture 2824.30 2824.40 0
2014-03-10 Multi-Stage Fracture 2756.20 2756.30 0
2014-03-10 Multi-Stage Fracture 2687.90 2688.00 0
2014-03-10 Multi-Stage Fracture 2632.90 2633.00 0
2014-03-10 Multi-Stage Fracture 2564.60 2564.70 0
2014-03-10 Multi-Stage Fracture 2496.00 2496.10 0
2014-03-10 Multi-Stage Fracture 2440.50 2440.60 0
2014-03-10 Multi-Stage Fracture 2371.50 2371.60 0
2014-03-10 Multi-Stage Fracture 2303.20 2303.30 0
2014-03-07 Multi-Stage Fracture 3905.90 3906.00 0
2014-03-10 Multi-Stage Fracture 2248.30 2248.40 0
2014-03-10 Multi-Stage Fracture 2180.00 2180.10 0
2014-03-10 Multi-Stage Fracture 2111.60 2111.70 0
2014-03-10 Multi-Stage Fracture 2056.80 2056.90 0
2014-03-10 Multi-Stage Fracture 1988.40 1988.50 0
2014-03-10 Multi-Stage Fracture 1920.00 1920.10 0
2014-03-10 Multi-Stage Fracture 1851.90 1852.00 0
2014-03-10 Multi-Stage Fracture 1783.50 1783.60 0
2014-03-07 Multi-Stage Fracture 3837.60 3837.70 0
2014-03-07 Multi-Stage Fracture 3714.20 3714.30 0
2014-03-07 Multi-Stage Fracture 3645.80 3645.90 0
2014-03-07 Multi-Stage Fracture 3591.00 3591.10 0
2014-03-07 Multi-Stage Fracture 3522.60 3522.70 0
2014-03-07 Multi-Stage Fracture 3782.60 3782.70 0
2014-03-10 Multi-Stage Fracture 2947.60 2948.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-07 2014-03-10 1,447 3,584 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 88.9505 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 8.94 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 3.0603 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0132 N/A
dibromoacetonitrile 3252-43-5 100 0.0132 N/A
non-hazardous ingredients Not Available 100 0.0132 N/A
polyethylene glycol 25322-68-3 100 0.0132 N/A
sodium bromide 7647-15-6 100 0.0132 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.2034 N/A
water Not Available 100 0.2034 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0511 N/A
propylene glycol 57-55-6 100 0.0511 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1145 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-02-07 2014-03-30 Surface Water - Lake 3580

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6817 0.0 0.0 0.0
2015 8382 0.0 0.0 0.0
2016 8190 0.0 0.0 0.0
2017 8687 0.0 0.0 0.0
2018 8605 0.0 0.0 0.0
2019 8678 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-21 No Incident Encountered 0.00 0.00
2014-03-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References