X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475063604000

Well Details

Well ID: 0475063604000
Loading map...
Location: 00/04-36-047-06W5/0
Location Alias: 00/04-36-47-06 W5M
Location Alias 2: 00/04-36-047-06 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 06
Section: 36
County/Municipality: Brazeau County
Well Name: BONTERRA HZ PEMBINA 4-36-47-6
Operator Name: Bonterra Energy Corp.
License Number: 0463719
License Date: 2014-01-14
License Status: Issued
Spud Date: 2014-01-31
Final Drill Date: 2014-02-07
Well Total Depth: 3929.00 m
Surface Hole Latitude: 53.115111
Surface Hole Longitude: -114.756422

For data sources see[1][2]

Well History

Date Event
2014-01-14 Obtained License
2014-02-01 Surface Casing Operation Performed
2014-02-02 Direction Drilling Operation Performed - Deviate
2014-02-03 Direction Drilling Operation Performed - Horizontal
2014-02-07 Finished Drilling
2014-02-07 Well Mode changed to Drilled and Cased
2014-02-09 Production Casing Operation Performed
2014-02-09 Rig Released
2014-02-22 Well Log Performed
2014-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-10 Well Began Production
2014-03-10 Well Fluid changed to Crude Oil
2014-03-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-31 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-02 718.90 Deviate (5 - 79 degrees)
2014-02-03 1553.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-02-28 Multi-Stage Fracture 3896.30 3897.30 0
2014-02-28 Multi-Stage Fracture 3319.40 3320.40 0
2014-02-28 Multi-Stage Fracture 3249.80 3250.80 0
2014-02-28 Multi-Stage Fracture 3193.60 3194.60 0
2014-02-28 Multi-Stage Fracture 3123.90 3124.90 0
2014-02-28 Multi-Stage Fracture 3054.20 3055.20 0
2014-02-28 Multi-Stage Fracture 2984.50 2985.50 0
2014-02-28 Multi-Stage Fracture 2928.30 2929.30 0
2014-02-28 Multi-Stage Fracture 2859.00 2860.00 0
2014-02-28 Multi-Stage Fracture 2789.30 2790.30 0
2014-02-28 Multi-Stage Fracture 2719.60 2720.60 0
2014-02-28 Multi-Stage Fracture 3848.10 3849.10 0
2014-02-28 Multi-Stage Fracture 2663.60 2664.60 0
2014-02-28 Multi-Stage Fracture 2594.10 2595.10 0
2014-02-28 Multi-Stage Fracture 2524.80 2525.80 0
2014-02-28 Multi-Stage Fracture 2455.40 2456.40 0
2014-02-28 Multi-Stage Fracture 2399.80 2400.80 0
2014-02-28 Multi-Stage Fracture 2330.80 2331.80 0
2014-02-28 Multi-Stage Fracture 2262.00 2263.00 0
2014-02-28 Multi-Stage Fracture 2192.30 2193.30 0
2014-02-28 Multi-Stage Fracture 2136.80 2137.80 0
2014-02-28 Multi-Stage Fracture 2067.20 2068.20 0
2014-02-28 Multi-Stage Fracture 3778.40 3779.40 0
2014-02-28 Multi-Stage Fracture 1997.50 1998.50 0
2014-02-28 Multi-Stage Fracture 1941.40 1942.40 0
2014-02-28 Multi-Stage Fracture 1871.70 1872.70 0
2014-02-28 Multi-Stage Fracture 1802.00 1803.00 0
2014-02-28 Multi-Stage Fracture 1732.30 1733.30 0
2014-02-28 Multi-Stage Fracture 1676.10 1677.10 0
2014-02-28 Multi-Stage Fracture 3710.50 3711.50 0
2014-02-28 Multi-Stage Fracture 3654.40 3655.40 0
2014-02-28 Multi-Stage Fracture 3584.70 3585.70 0
2014-02-28 Multi-Stage Fracture 3515.00 3516.00 0
2014-02-28 Multi-Stage Fracture 3445.30 3446.30 0
2014-02-28 Multi-Stage Fracture 3389.10 3390.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-28 2014-02-28 1,456 5,264 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 87.8201 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 7.9573 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 3.8291 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0125 N/A
dibromoacetonitrile 3252-43-5 100 0.0125 N/A
non-hazardous ingredients Not Available 100 0.0125 N/A
polyethylene glycol 25322-68-3 100 0.0125 N/A
sodium bromide 7647-15-6 100 0.0125 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.2158 N/A
water Not Available 100 0.2158 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0505 N/A
propylene glycol 57-55-6 100 0.0505 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1143 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-07 2014-03-30 Surface Water - Lake 5685

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 7022 0.0 0.0 0.0
2015 8694 0.0 0.0 0.0
2016 7047 0.0 0.0 0.0
2017 3205 0.0 0.0 0.0
2018 2940 0.0 0.0 0.0
2019 5806 0.0 0.0 0.0
2020 2151 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-09 No Incident Encountered 0.00 0.00
2014-02-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References