X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475061816030

Well Details

Well ID: 0475061816030
Loading map...
Location: 03/16-18-047-06W5/0
Location Alias: 03/16-18-47-06 W5M
Location Alias 2: 03/16-18-047-06 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 06
Section: 18
County/Municipality: County of Wetaskiwin No. 10
Well Name: BONTERRA 103 HZ PEMBINA 16-18-47-6
Operator Name: Bonterra Energy Corp.
License Number: 0493717
License Date: 2019-02-07
License Status: Amended
Spud Date: 2019-03-30
Final Drill Date: 2019-04-05
Well Total Depth: 3475.00 m
Surface Hole Latitude: 53.056020
Surface Hole Longitude: -114.889281

For data sources see[1][2]

Well History

Date Event
2019-02-07 Obtained License
2019-03-31 Surface Casing Operation Performed
2019-04-01 Direction Drilling Operation Performed - Deviate
2019-04-03 Direction Drilling Operation Performed - Horizontal
2019-04-05 Finished Drilling
2019-04-05 Well Mode changed to Drilled and Cased
2019-04-06 Production Casing Operation Performed
2019-04-06 Well Log Performed
2019-04-07 Rig Released
2019-04-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-22 Well Began Production
2019-04-22 Well Fluid changed to Crude Oil
2019-04-22 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-04-01 629.70 Deviate (5 - 79 degrees)
2019-04-03 1856.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-04-11 Multi-Stage Fracture 3449.70 3450.40 0
2019-04-11 Multi-Stage Fracture 3030.60 3031.20 0
2019-04-11 Multi-Stage Fracture 2984.00 2984.70 0
2019-04-11 Multi-Stage Fracture 2937.50 2938.10 0
2019-04-11 Multi-Stage Fracture 2890.70 2891.30 0
2019-04-11 Multi-Stage Fracture 2844.30 2845.00 0
2019-04-11 Multi-Stage Fracture 2797.50 2798.20 0
2019-04-11 Multi-Stage Fracture 2750.80 2751.50 0
2019-04-11 Multi-Stage Fracture 2704.40 2705.10 0
2019-04-11 Multi-Stage Fracture 2565.10 2565.70 0
2019-04-11 Multi-Stage Fracture 2518.40 2519.10 0
2019-04-11 Multi-Stage Fracture 3403.00 3403.70 0
2019-04-11 Multi-Stage Fracture 2471.90 2472.60 0
2019-04-11 Multi-Stage Fracture 2425.40 2426.00 0
2019-04-11 Multi-Stage Fracture 2378.50 2379.20 0
2019-04-12 Multi-Stage Fracture 2331.50 2332.20 0
2019-04-12 Multi-Stage Fracture 2285.20 2285.90 0
2019-04-12 Multi-Stage Fracture 2238.60 2239.30 0
2019-04-12 Multi-Stage Fracture 2191.90 2192.60 0
2019-04-12 Multi-Stage Fracture 2145.40 2146.10 0
2019-04-12 Multi-Stage Fracture 2099.00 2099.60 0
2019-04-12 Multi-Stage Fracture 2063.90 2064.60 0
2019-04-11 Multi-Stage Fracture 3356.70 3357.40 0
2019-04-11 Multi-Stage Fracture 3310.00 3310.70 0
2019-04-11 Multi-Stage Fracture 3263.20 3263.90 0
2019-04-11 Multi-Stage Fracture 3217.10 3217.80 0
2019-04-11 Multi-Stage Fracture 3170.70 3171.40 0
2019-04-11 Multi-Stage Fracture 3124.00 3124.70 0
2019-04-11 Multi-Stage Fracture 3077.40 3078.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-04-11 2019-04-12 1,560 2,765 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.8264 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 12.9565 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 4.6206 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0295 N/A
dibromoacetonitrile 3252-43-5 100 0.0295 N/A
non-hazardous ingredients Not Available 100 0.0295 N/A
polyethylene glycol 25322-68-3 100 0.0295 N/A
sodium bromide 7647-15-6 100 0.0295 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0884 N/A
water Not Available 100 0.0884 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0447 N/A
non-hazardous ingredients Not Available 100 0.0447 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0397 N/A
non-hazardous ingredients Not Available 100 0.0397 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-04-09 2019-04-14 Surface Water - Runoff 255
2019-04-11 2019-04-11 Surface Water - Runoff 2658

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5658 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-07 No Incident Encountered 0.00 0.00
2019-04-12 No Incident Encountered 0.00 0.00

For data sources see[9]

References