X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475061809020

Well Details

Well ID: 0475061809020
Loading map...
Location: 02/09-18-047-06W5/0
Location Alias: 02/09-18-47-06 W5M
Location Alias 2: 02/09-18-047-06 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 06
Section: 18
County/Municipality: County of Wetaskiwin No. 10
Well Name: BONTERRA 102 HZ PEMBINA 9-18-47-6
Operator Name: Bonterra Energy Corp.
License Number: 0493720
License Date: 2019-02-08
License Status: Amended
Spud Date: 2019-03-22
Final Drill Date: 2019-03-28
Well Total Depth: 3396.00 m
Surface Hole Latitude: 53.056020
Surface Hole Longitude: -114.889132

For data sources see[1][2]

Well History

Date Event
2019-02-08 Obtained License
2019-03-23 Surface Casing Operation Performed
2019-03-24 Direction Drilling Operation Performed - Deviate
2019-03-25 Direction Drilling Operation Performed - Horizontal
2019-03-28 Finished Drilling
2019-03-28 Well Mode changed to Drilled and Cased
2019-03-29 Production Casing Operation Performed
2019-03-29 Well Log Performed
2019-03-30 Rig Released
2019-04-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-21 Well Began Production
2019-04-21 Well Fluid changed to Crude Oil
2019-04-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-22 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-24 615.70 Deviate (5 - 79 degrees)
2019-03-25 1782.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-04-12 Multi-Stage Fracture 3365.00 3366.90 0
2019-04-13 Multi-Stage Fracture 2914.40 2916.30 0
2019-04-13 Multi-Stage Fracture 2864.00 2865.90 0
2019-04-13 Multi-Stage Fracture 2813.70 2815.60 0
2019-04-13 Multi-Stage Fracture 2763.70 2765.60 0
2019-04-13 Multi-Stage Fracture 2713.40 2715.40 0
2019-04-13 Multi-Stage Fracture 2662.80 2664.70 0
2019-04-13 Multi-Stage Fracture 2613.20 2615.10 0
2019-04-13 Multi-Stage Fracture 2563.10 2565.00 0
2019-04-13 Multi-Stage Fracture 2512.80 2514.70 0
2019-04-13 Multi-Stage Fracture 2462.40 2464.30 0
2019-04-12 Multi-Stage Fracture 3314.80 3316.70 0
2019-04-13 Multi-Stage Fracture 2412.60 2414.50 0
2019-04-13 Multi-Stage Fracture 2362.00 2363.90 0
2019-04-13 Multi-Stage Fracture 2311.60 2313.50 0
2019-04-13 Multi-Stage Fracture 2260.90 2262.80 0
2019-04-13 Multi-Stage Fracture 2210.40 2212.30 0
2019-04-13 Multi-Stage Fracture 2159.70 2161.60 0
2019-04-13 Multi-Stage Fracture 2109.20 2111.10 0
2019-04-13 Multi-Stage Fracture 2070.40 2072.30 0
2019-04-13 Multi-Stage Fracture 2031.50 2033.50 0
2019-04-13 Multi-Stage Fracture 1992.40 1994.30 0
2019-04-12 Multi-Stage Fracture 3264.80 3266.70 0
2019-04-12 Multi-Stage Fracture 3214.80 3216.80 0
2019-04-12 Multi-Stage Fracture 3164.90 3166.80 0
2019-04-12 Multi-Stage Fracture 3114.60 3116.50 0
2019-04-12 Multi-Stage Fracture 3064.80 3066.70 0
2019-04-12 Multi-Stage Fracture 3014.50 3016.50 0
2019-04-13 Multi-Stage Fracture 2964.60 2966.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-04-12 2019-04-13 1,559 2,642 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 81.3343 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 13.7845 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 4.6716 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0306 N/A
dibromoacetonitrile 3252-43-5 100 0.0307 N/A
non-hazardous ingredients Not Available 100 0.0306 N/A
polyethylene glycol 25322-68-3 100 0.0306 N/A
sodium bromide 7647-15-6 100 0.0306 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0874 N/A
water Not Available 100 0.0874 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0514 N/A
non-hazardous ingredients Not Available 100 0.0514 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0399 N/A
non-hazardous ingredients Not Available 100 0.0399 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-04-09 2019-04-14 Surface Water - Runoff 2819

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5562 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-30 No Incident Encountered 0.00 0.00
2019-04-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References