X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475053402000

Well Details

Well ID: 0475053402000
Loading map...
Location: 00/02-34-047-05W5/0
Location Alias: 00/02-34-47-05 W5M
Location Alias 2: 00/02-34-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 34
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ PEMBINA 2-34-47-5
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0441974
License Date: 2011-12-22
License Status: Issued
Spud Date: 2012-01-17
Final Drill Date: 2012-01-25
Well Total Depth: 3087.00 m
Surface Hole Latitude: 53.108547
Surface Hole Longitude: -114.643667

For data sources see[1][2]

Well History

Date Event
2011-12-22 Obtained License
2012-01-17 Well Log Performed
2012-01-18 Surface Casing Operation Performed
2012-01-20 Direction Drilling Operation Performed - Horizontal
2012-01-22 Well Log Performed
2012-01-25 Finished Drilling
2012-01-25 Well Log Performed
2012-01-25 Well Mode changed to Drilled and Cased
2012-01-28 Production Casing Operation Performed
2012-01-29 Rig Released
2012-02-03 Well Log Performed
2012-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-11 Perforation Treatment Performed - Open-Hole Completion
2012-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-22 Well Began Production
2012-02-22 Well Fluid changed to Crude Oil
2012-02-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-17 Nabors Drilling Limited 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-20 947.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-11 Open Hole/Barefoot Completion 3082.00 3087.00 0
2012-02-12 Multi-Stage Fracture 2457.90 2458.00 0
2012-02-12 Multi-Stage Fracture 2389.40 2389.50 0
2012-02-12 Multi-Stage Fracture 2308.40 2308.50 0
2012-02-12 Multi-Stage Fracture 2239.30 2239.40 0
2012-02-12 Multi-Stage Fracture 2157.70 2157.80 0
2012-02-12 Multi-Stage Fracture 2089.40 2089.50 0
2012-02-12 Multi-Stage Fracture 2012.60 2012.70 0
2012-02-12 Multi-Stage Fracture 1943.40 1943.50 0
2012-02-12 Multi-Stage Fracture 1865.60 1865.70 0
2012-02-12 Multi-Stage Fracture 1797.60 1797.70 0
2012-02-11 Multi-Stage Fracture 3045.30 3045.40 0
2012-02-12 Multi-Stage Fracture 1716.70 1716.80 0
2012-02-11 Multi-Stage Fracture 2970.20 2970.30 0
2012-02-11 Multi-Stage Fracture 2899.20 2899.30 0
2012-02-11 Multi-Stage Fracture 2829.70 2829.80 0
2012-02-12 Multi-Stage Fracture 2851.20 2851.30 0
2012-02-12 Multi-Stage Fracture 2676.90 2677.00 0
2012-02-12 Multi-Stage Fracture 2602.90 2603.00 0
2012-02-12 Multi-Stage Fracture 2526.20 2526.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7116 0.0 0.0 0.0
2013 7817 0.0 0.0 0.0
2014 8656 0.0 0.0 0.0
2015 8643 0.0 0.0 0.0
2016 8562 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8531 0.0 0.0 0.0
2019 6902 0.0 0.0 0.0

For data sources see[7]

References