X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475053313000

Well Details

Well ID: 0475053313000
Loading map...
Location: 00/13-33-047-05W5/0
Location Alias: 00/13-33-47-05 W5M
Location Alias 2: 00/13-33-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 33
County/Municipality: Brazeau County
Well Name: BONTERRA HZ PEMBINA 13-33-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0487839
License Date: 2018-01-26
License Status: Issued
Spud Date: 2018-01-31
Final Drill Date: 2018-02-04
Well Total Depth: 3139.00 m
Surface Hole Latitude: 53.102542
Surface Hole Longitude: -114.655779

For data sources see[1][2]

Well History

Date Event
2018-01-26 Obtained License
2018-02-01 Surface Casing Operation Performed
2018-02-02 Direction Drilling Operation Performed - Deviate
2018-02-02 Direction Drilling Operation Performed - Horizontal
2018-02-04 Finished Drilling
2018-02-04 Well Mode changed to Drilled and Cased
2018-02-05 Well Log Performed
2018-02-06 Production Casing Operation Performed
2018-02-06 Rig Released
2018-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-12 Well Began Production
2018-03-12 Well Fluid changed to Crude Oil
2018-03-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-31 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-02 1088.20 Deviate (5 - 79 degrees)
2018-02-02 1529.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-02 Multi-Stage Fracture 3125.90 3126.40 0
2018-03-02 Multi-Stage Fracture 2675.50 2677.40 0
2018-03-02 Multi-Stage Fracture 2625.10 2627.00 0
2018-03-02 Multi-Stage Fracture 2574.10 2576.10 0
2018-03-02 Multi-Stage Fracture 2523.90 2525.80 0
2018-03-02 Multi-Stage Fracture 2472.90 2474.90 0
2018-03-02 Multi-Stage Fracture 2422.80 2424.70 0
2018-03-02 Multi-Stage Fracture 2372.20 2374.20 0
2018-03-02 Multi-Stage Fracture 2322.30 2324.20 0
2018-03-02 Multi-Stage Fracture 2272.10 2274.00 0
2018-03-02 Multi-Stage Fracture 2221.80 2223.70 0
2018-03-02 Multi-Stage Fracture 3077.60 3079.50 0
2018-03-02 Multi-Stage Fracture 2171.30 2173.20 0
2018-03-02 Multi-Stage Fracture 2120.90 2122.90 0
2018-03-02 Multi-Stage Fracture 2070.70 2072.60 0
2018-03-02 Multi-Stage Fracture 2020.10 2022.00 0
2018-03-02 Multi-Stage Fracture 1969.70 1971.60 0
2018-03-02 Multi-Stage Fracture 1919.80 1921.70 0
2018-03-02 Multi-Stage Fracture 1869.10 1871.00 0
2018-03-02 Multi-Stage Fracture 1818.80 1820.70 0
2018-03-02 Multi-Stage Fracture 1768.00 1769.90 0
2018-03-02 Multi-Stage Fracture 1718.10 1720.00 0
2018-03-02 Multi-Stage Fracture 3027.10 3029.00 0
2018-03-02 Multi-Stage Fracture 1667.60 1669.50 0
2018-03-02 Multi-Stage Fracture 1617.00 1618.90 0
2018-03-02 Multi-Stage Fracture 1566.90 1568.90 0
2018-03-02 Multi-Stage Fracture 2976.80 2978.70 0
2018-03-02 Multi-Stage Fracture 2926.60 2928.50 0
2018-03-02 Multi-Stage Fracture 2876.30 2878.20 0
2018-03-02 Multi-Stage Fracture 2826.00 2827.90 0
2018-03-02 Multi-Stage Fracture 2775.70 2777.60 0
2018-03-02 Multi-Stage Fracture 2725.40 2727.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-02 2018-03-02 1,401 2,979 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 94.1043 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 3.9304 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 1.9652 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.011 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.011 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0916 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0916 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0505 N/A
Tergitol 15-S-20 68131-40-8 100 0.0505 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-23 2018-02-26 Surface Water - Runoff 3274

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6687 0.0 0.0 0.0
2019 8412 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-06 No Incident Encountered 0.00 0.00
2018-03-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References