X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475053304040

Well Details

Well ID: 0475053304040
Loading map...
Location: 04/04-33-047-05W5/0
Location Alias: 04/04-33-47-05 W5M
Location Alias 2: 04/04-33-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 33
County/Municipality: Brazeau County
Well Name: BONTERRA 104 HZ PEMBINA 4-33-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0490801
License Date: 2018-09-06
License Status: Issued
Spud Date: 2019-01-11
Final Drill Date: 2019-01-15
Well Total Depth: 3014.00 m
Surface Hole Latitude: 53.092542
Surface Hole Longitude: -114.656464

For data sources see[1][2]

Well History

Date Event
2018-09-06 Obtained License
2019-01-12 Surface Casing Operation Performed
2019-01-13 Direction Drilling Operation Performed - Deviate
2019-01-13 Direction Drilling Operation Performed - Horizontal
2019-01-15 Finished Drilling
2019-01-15 Well Mode changed to Drilled and Cased
2019-01-16 Production Casing Operation Performed
2019-01-16 Well Log Performed
2019-01-17 Rig Released
2019-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-09 Well Began Production
2019-02-09 Well Fluid changed to Crude Oil
2019-02-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-11 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-13 1044.60 Deviate (5 - 79 degrees)
2019-01-13 1570.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-30 Multi-Stage Fracture 2964.70 2966.60 0
2019-01-30 Multi-Stage Fracture 2517.30 2519.20 0
2019-01-30 Multi-Stage Fracture 2467.70 2469.60 0
2019-01-30 Multi-Stage Fracture 2417.70 2419.60 0
2019-01-30 Multi-Stage Fracture 2367.40 2369.30 0
2019-01-30 Multi-Stage Fracture 2317.70 2319.70 0
2019-01-30 Multi-Stage Fracture 2268.30 2270.20 0
2019-01-30 Multi-Stage Fracture 2218.70 2220.60 0
2019-01-30 Multi-Stage Fracture 2168.90 2170.80 0
2019-01-30 Multi-Stage Fracture 2119.30 2121.20 0
2019-01-30 Multi-Stage Fracture 2069.90 2071.80 0
2019-01-30 Multi-Stage Fracture 2914.70 2916.60 0
2019-01-30 Multi-Stage Fracture 2020.20 2022.10 0
2019-01-30 Multi-Stage Fracture 1970.80 1972.70 0
2019-01-30 Multi-Stage Fracture 1920.80 1922.70 0
2019-01-30 Multi-Stage Fracture 1871.40 1873.30 0
2019-01-30 Multi-Stage Fracture 1821.70 1823.60 0
2019-01-30 Multi-Stage Fracture 1771.60 1773.50 0
2019-01-30 Multi-Stage Fracture 1722.40 1724.30 0
2019-01-30 Multi-Stage Fracture 1672.60 1674.50 0
2019-01-30 Multi-Stage Fracture 1634.00 1635.90 0
2019-01-30 Multi-Stage Fracture 1595.80 1597.70 0
2019-01-30 Multi-Stage Fracture 2865.10 2867.00 0
2019-01-30 Multi-Stage Fracture 2815.20 2817.20 0
2019-01-30 Multi-Stage Fracture 2765.70 2767.60 0
2019-01-30 Multi-Stage Fracture 2715.60 2717.60 0
2019-01-30 Multi-Stage Fracture 2666.20 2668.10 0
2019-01-30 Multi-Stage Fracture 2616.80 2618.80 0
2019-01-30 Multi-Stage Fracture 2565.20 2567.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-30 2019-01-30 1,402 2,240 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.29 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 11.0667 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 5.419 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.029 N/A
dibromoacetonitrile 3252-43-5 100 0.029 N/A
non-hazardous ingredients Not Available 100 0.029 N/A
polyethylene glycol 25322-68-3 100 0.029 N/A
sodium bromide 7647-15-6 100 0.029 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0994 N/A
water Not Available 100 0.0994 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0514 N/A
non-hazardous ingredients Not Available 100 0.0514 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0442 N/A
non-hazardous ingredients Not Available 100 0.0442 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-28 2019-01-31 Surface Water - Runoff 2266

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7709 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-17 No Incident Encountered 0.00 0.00
2019-01-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References