X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475053304030

Well Details

Well ID: 0475053304030
Loading map...
Location: 03/04-33-047-05W5/0
Location Alias: 03/04-33-47-05 W5M
Location Alias 2: 03/04-33-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 33
County/Municipality: Brazeau County
Well Name: BONTERRA 103 HZ PEMBINA 4-33-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0490800
License Date: 2018-09-06
License Status: Issued
Spud Date: 2019-01-17
Final Drill Date: 2019-01-22
Well Total Depth: 2995.00 m
Surface Hole Latitude: 53.092452
Surface Hole Longitude: -114.656463

For data sources see[1][2]

Well History

Date Event
2018-09-06 Obtained License
2019-01-18 Surface Casing Operation Performed
2019-01-19 Direction Drilling Operation Performed - Deviate
2019-01-20 Direction Drilling Operation Performed - Horizontal
2019-01-22 Finished Drilling
2019-01-22 Well Log Performed
2019-01-22 Well Mode changed to Drilled and Cased
2019-01-23 Production Casing Operation Performed
2019-01-23 Rig Released
2019-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-09 Well Began Production
2019-02-09 Well Fluid changed to Crude Oil
2019-02-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-17 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-19 1044.60 Deviate (5 - 79 degrees)
2019-01-20 1551.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-31 Multi-Stage Fracture 2945.90 2947.80 0
2019-01-31 Multi-Stage Fracture 2499.50 2501.40 0
2019-01-31 Multi-Stage Fracture 2449.90 2451.80 0
2019-01-31 Multi-Stage Fracture 2399.90 2401.80 0
2019-01-31 Multi-Stage Fracture 2350.40 2352.30 0
2019-01-31 Multi-Stage Fracture 2300.70 2302.60 0
2019-01-31 Multi-Stage Fracture 2251.10 2253.00 0
2019-01-31 Multi-Stage Fracture 2201.60 2203.50 0
2019-01-31 Multi-Stage Fracture 2152.20 2154.10 0
2019-01-31 Multi-Stage Fracture 2102.60 2104.50 0
2019-01-31 Multi-Stage Fracture 2053.00 2054.90 0
2019-01-31 Multi-Stage Fracture 2896.40 2898.40 0
2019-01-31 Multi-Stage Fracture 2003.50 2005.40 0
2019-01-31 Multi-Stage Fracture 1953.60 1955.50 0
2019-01-31 Multi-Stage Fracture 1903.50 1905.50 0
2019-01-31 Multi-Stage Fracture 1854.80 1856.70 0
2019-01-31 Multi-Stage Fracture 1805.70 1807.70 0
2019-01-31 Multi-Stage Fracture 1756.50 1758.40 0
2019-01-31 Multi-Stage Fracture 1706.50 1708.40 0
2019-01-31 Multi-Stage Fracture 1657.50 1659.40 0
2019-01-31 Multi-Stage Fracture 1618.90 1620.80 0
2019-01-31 Multi-Stage Fracture 1580.50 1582.40 0
2019-01-31 Multi-Stage Fracture 2846.70 2848.60 0
2019-01-31 Multi-Stage Fracture 2796.80 2798.70 0
2019-01-31 Multi-Stage Fracture 2747.30 2749.20 0
2019-01-31 Multi-Stage Fracture 2697.70 2699.60 0
2019-01-31 Multi-Stage Fracture 2648.00 2649.90 0
2019-01-31 Multi-Stage Fracture 2598.30 2600.20 0
2019-01-31 Multi-Stage Fracture 2548.90 2550.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-31 2019-01-31 1,407 2,332 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.811 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 10.7032 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 5.2748 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0217 N/A
dibromoacetonitrile 3252-43-5 100 0.0217 N/A
non-hazardous ingredients Not Available 100 0.0217 N/A
polyethylene glycol 25322-68-3 100 0.0217 N/A
sodium bromide 7647-15-6 100 0.0217 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0964 N/A
water Not Available 100 0.0964 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0484 N/A
non-hazardous ingredients Not Available 100 0.0484 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0442 N/A
non-hazardous ingredients Not Available 100 0.0442 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-28 2019-01-31 Surface Water - Runoff 2486

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7728 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-23 No Incident Encountered 0.00 0.00
2019-01-31 No Incident Encountered 0.00 0.00

For data sources see[10]

References