X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475053209020

Well Details

Well ID: 0475053209020
Loading map...
Location: 02/09-32-047-05W5/0
Location Alias: 02/09-32-47-05 W5M
Location Alias 2: 02/09-32-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 32
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 9-32-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0479657
License Date: 2016-06-14
License Status: Amended
Spud Date: 2017-03-30
Final Drill Date: 2017-04-04
Well Total Depth: 3056.00 m
Surface Hole Latitude: 53.114227
Surface Hole Longitude: -114.687029

For data sources see[1][2]

Well History

Date Event
2016-06-14 Obtained License
2017-03-31 Surface Casing Operation Performed
2017-04-01 Direction Drilling Operation Performed - Deviate
2017-04-02 Direction Drilling Operation Performed - Horizontal
2017-04-04 Finished Drilling
2017-04-04 Well Log Performed
2017-04-04 Well Mode changed to Drilled and Cased
2017-04-05 Production Casing Operation Performed
2017-04-05 Rig Released
2017-05-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-18 Well Began Production
2017-05-18 Well Fluid changed to Crude Oil
2017-05-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-03-30 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-04-01 1151.20 Deviate (5 - 79 degrees)
2017-04-02 1521.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-05-03 Multi-Stage Fracture 3020.50 3021.10 0
2017-05-03 Multi-Stage Fracture 2566.70 2568.50 0
2017-05-03 Multi-Stage Fracture 2516.60 2518.50 0
2017-05-03 Multi-Stage Fracture 2466.00 2467.90 0
2017-05-03 Multi-Stage Fracture 2415.00 2416.90 0
2017-05-03 Multi-Stage Fracture 2364.00 2365.90 0
2017-05-03 Multi-Stage Fracture 2313.40 2315.30 0
2017-05-03 Multi-Stage Fracture 2263.10 2265.00 0
2017-05-03 Multi-Stage Fracture 2212.20 2214.10 0
2017-05-03 Multi-Stage Fracture 2161.30 2163.20 0
2017-05-03 Multi-Stage Fracture 2110.90 2112.80 0
2017-05-03 Multi-Stage Fracture 2972.00 2973.90 0
2017-05-03 Multi-Stage Fracture 2060.30 2062.20 0
2017-05-03 Multi-Stage Fracture 2009.70 2011.60 0
2017-05-03 Multi-Stage Fracture 1959.30 1961.20 0
2017-05-03 Multi-Stage Fracture 1908.60 1910.50 0
2017-05-03 Multi-Stage Fracture 1858.20 1860.10 0
2017-05-03 Multi-Stage Fracture 1807.80 1809.70 0
2017-05-03 Multi-Stage Fracture 1756.90 1758.80 0
2017-05-03 Multi-Stage Fracture 1706.50 1708.40 0
2017-05-03 Multi-Stage Fracture 1655.70 1657.60 0
2017-05-04 Multi-Stage Fracture 1604.80 1606.70 0
2017-05-03 Multi-Stage Fracture 2921.60 2923.50 0
2017-05-04 Multi-Stage Fracture 1554.00 1555.90 0
2017-05-03 Multi-Stage Fracture 2871.00 2872.90 0
2017-05-03 Multi-Stage Fracture 2820.30 2822.20 0
2017-05-03 Multi-Stage Fracture 2770.00 2771.90 0
2017-05-03 Multi-Stage Fracture 2719.30 2721.20 0
2017-05-03 Multi-Stage Fracture 2668.20 2670.00 0
2017-05-03 Multi-Stage Fracture 2617.60 2619.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-03 2017-05-04 1,408 3,199 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 87.1384 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 4.573 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 8.0922 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0103 N/A
2-mercaptoethanol 60-24-2 100 0.0103 N/A
dibromoacetonitrile 3252-43-5 100 0.0103 N/A
non-hazardous ingredients Not Available 100 0.0103 N/A
sodium bromide 7647-15-6 100 0.0103 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.093 N/A
water Not Available 100 0.093 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0444 N/A
propylene glycol 57-55-6 100 0.0444 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0483 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0483 N/A
non-hazardous ingredients Not Available 100 0.0483 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-05-04 2017-05-06 Surface Water - Runoff 3000
2017-05-05 2017-05-07 Surface Water - Runoff 405

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5158 0.0 0.0 0.0
2018 8554 0.0 0.0 0.0
2019 8596 0.0 0.0 0.0
2020 1945 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-04-05 No Incident Encountered 0.00 0.00
2017-05-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References