If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475052813000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.074607,"lon":-114.679123,"icon":""}]} |
Location: 00/13-28-047-05W5/0 | |
Location Alias: 00/13-28-47-05 W5M | |
Location Alias 2: 00/13-28-047-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 05 | |
Section: 28 | |
County/Municipality: Brazeau County | |
Well Name: WHITECAP PEMBINA 13-28-47-5 | |
Operator Name: Whitecap Resources Inc. | |
License Number: 0448625 | |
License Date: 2012-09-20 | |
License Status: Issued | |
Spud Date: 2012-10-26 | |
Final Drill Date: 2012-11-02 | |
Well Total Depth: 3010.00 m | |
Surface Hole Latitude: 53.074607 | |
Surface Hole Longitude: -114.679123 |
Date | Event |
---|---|
2012-09-20 | Obtained License |
2012-10-27 | Surface Casing Operation Performed |
2012-10-29 | Direction Drilling Operation Performed - Deviate |
2012-10-30 | Well Log Performed |
2012-10-31 | Direction Drilling Operation Performed - Horizontal |
2012-10-31 | Intermediate Casing Operation Performed |
2012-11-02 | Finished Drilling |
2012-11-02 | Well Mode changed to Drilled and Cased |
2012-11-03 | Liner Casing Operation Performed |
2012-11-03 | Well Log Performed |
2012-11-04 | Rig Released |
2012-11-08 | Well Log Performed |
2012-11-14 | Perforation Treatment Performed - Casing Vent Production |
2012-11-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-15 | Well Began Production |
2012-11-15 | Well Fluid changed to Crude Oil |
2012-11-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-17 | Nabors Drilling Limited | 12 | N/A | Drill To LD |
2012-10-26 | Nabors Drilling Limited | 12 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-29 | 1153.00 | Deviate (5 - 79 degrees) |
2012-10-31 | 1573.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-14 | Casing Vent Production | 3008.00 | 3010.00 | 0 |
2012-11-14 | Multi-Stage Fracture | 2365.00 | 2365.10 | 0 |
2012-11-14 | Multi-Stage Fracture | 2279.00 | 2279.10 | 0 |
2012-11-14 | Multi-Stage Fracture | 2206.50 | 2206.60 | 0 |
2012-11-14 | Multi-Stage Fracture | 2134.20 | 2134.30 | 0 |
2012-11-14 | Multi-Stage Fracture | 2048.30 | 2048.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1975.90 | 1976.00 | 0 |
2012-11-14 | Multi-Stage Fracture | 1903.50 | 1903.60 | 0 |
2012-11-14 | Multi-Stage Fracture | 1817.70 | 1817.80 | 0 |
2012-11-14 | Multi-Stage Fracture | 1745.60 | 1745.70 | 0 |
2012-11-14 | Multi-Stage Fracture | 1673.40 | 1673.50 | 0 |
2012-11-14 | Multi-Stage Fracture | 2971.00 | 2971.10 | 0 |
2012-11-14 | Multi-Stage Fracture | 2895.60 | 2895.70 | 0 |
2012-11-14 | Multi-Stage Fracture | 2823.20 | 2823.30 | 0 |
2012-11-14 | Multi-Stage Fracture | 2737.20 | 2737.30 | 0 |
2012-11-14 | Multi-Stage Fracture | 2665.00 | 2665.10 | 0 |
2012-11-14 | Multi-Stage Fracture | 2592.80 | 2592.90 | 0 |
2012-11-14 | Multi-Stage Fracture | 2507.40 | 2507.50 | 0 |
2012-11-14 | Multi-Stage Fracture | 2436.80 | 2436.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1438 | 0.0 | 0.0 | 0.0 |
2013 | 8720 | 0.0 | 0.0 | 0.0 |
2014 | 8637 | 0.0 | 0.0 | 0.0 |
2015 | 8331 | 0.0 | 0.0 | 0.0 |
2016 | 8554 | 0.0 | 0.0 | 0.0 |
2017 | 8678 | 0.0 | 0.0 | 0.0 |
2018 | 8747 | 0.0 | 0.0 | 0.0 |
2019 | 8267 | 0.0 | 0.0 | 0.0 |
2020 | 1991 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-31 | No Incident Encountered | 0.00 | 0.00 |
2012-11-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]