X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475052716020

Well Details

Well ID: 0475052716020
Loading map...
Location: 02/16-27-047-05W5/0
Location Alias: 02/16-27-47-05 W5M
Location Alias 2: 02/16-27-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 27
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 16-27-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0483821
License Date: 2017-06-02
License Status: Issued
Spud Date: 2017-08-15
Final Drill Date: 2017-08-20
Well Total Depth: 2978.00 m
Surface Hole Latitude: 53.088325
Surface Hole Longitude: -114.661611

For data sources see[1][2]

Well History

Date Event
2017-06-02 Obtained License
2017-08-16 Surface Casing Operation Performed
2017-08-17 Direction Drilling Operation Performed - Deviate
2017-08-18 Direction Drilling Operation Performed - Horizontal
2017-08-20 Finished Drilling
2017-08-20 Well Log Performed
2017-08-20 Well Mode changed to Drilled and Cased
2017-08-21 Production Casing Operation Performed
2017-08-21 Rig Released
2017-09-05 Well Log Performed
2017-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-04 Well Began Production
2017-10-04 Well Fluid changed to Crude Oil
2017-10-04 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-15 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-17 1169.80 Deviate (5 - 79 degrees)
2017-08-18 1531.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-15 Multi-Stage Fracture 2936.80 2937.30 0
2017-09-16 Multi-Stage Fracture 2468.10 2470.00 0
2017-09-16 Multi-Stage Fracture 2422.90 2424.80 0
2017-09-16 Multi-Stage Fracture 2365.00 2366.90 0
2017-09-16 Multi-Stage Fracture 2309.80 2311.70 0
2017-09-16 Multi-Stage Fracture 2254.60 2256.50 0
2017-09-16 Multi-Stage Fracture 2199.20 2201.00 0
2017-09-16 Multi-Stage Fracture 2143.60 2145.50 0
2017-09-16 Multi-Stage Fracture 2088.80 2090.70 0
2017-09-16 Multi-Stage Fracture 2033.50 2035.40 0
2017-09-16 Multi-Stage Fracture 1977.90 1979.80 0
2017-09-15 Multi-Stage Fracture 2880.60 2882.50 0
2017-09-16 Multi-Stage Fracture 1922.60 1924.50 0
2017-09-16 Multi-Stage Fracture 1867.40 1869.20 0
2017-09-16 Multi-Stage Fracture 1826.20 1827.30 0
2017-09-16 Multi-Stage Fracture 1770.70 1771.80 0
2017-09-16 Multi-Stage Fracture 1714.30 1716.20 0
2017-09-16 Multi-Stage Fracture 1658.70 1660.60 0
2017-09-16 Multi-Stage Fracture 1603.10 1605.00 0
2017-09-16 Multi-Stage Fracture 1548.20 1550.10 0
2017-09-15 Multi-Stage Fracture 2835.30 2837.20 0
2017-09-16 Multi-Stage Fracture 2776.70 2778.60 0
2017-09-16 Multi-Stage Fracture 2733.50 2735.40 0
2017-09-16 Multi-Stage Fracture 2674.90 2676.80 0
2017-09-16 Multi-Stage Fracture 2629.70 2631.60 0
2017-09-16 Multi-Stage Fracture 2571.00 2572.80 0
2017-09-16 Multi-Stage Fracture 2526.90 2528.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-15 2017-09-16 1,407 2,455 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.6414 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 9.7374 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 6.471 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0101 N/A
2-mercaptoethanol 60-24-2 100 0.0101 N/A
dibromoacetonitrile 3252-43-5 100 0.0101 N/A
non-hazardous ingredients Not Available 100 0.0101 N/A
sodium bromide 7647-15-6 100 0.0101 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0914 N/A
water Not Available 100 0.0914 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0436 N/A
propylene glycol 57-55-6 100 0.0436 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0475 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0475 N/A
non-hazardous ingredients Not Available 100 0.0475 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-15 2017-09-19 Surface Water - Runoff 2659

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2082 0.0 0.0 0.0
2018 8632 0.0 0.0 0.0
2019 8637 0.0 0.0 0.0
2020 1849 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-21 No Incident Encountered 0.00 0.00
2017-09-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References